Pennant Energy Inc.: Pennant Increases Production

Pennant Energy Inc.: Pennant Increases Production

ID: 11282

(firmenpresse) -
Pennant Energy Inc.: Pennant Increases Production

Pennant Energy Inc. (the “Company”) (TSX Venture Exchange – PEN”); the Company is pleased to announce that cash flow from operations increased significantly during the second quarter after a disappointing first quarter beginning to the 2009-2010 fiscal period. The poor first quarter showing felt the impact of low gas prices, compounded by an almost six week shut-in of the Badger property due to production allowable restrictions imposed by the ERCB. The Badger resumed full operation in September and was joined by the newly completed Ferrier well, as was announced in our September 17, 2009 press release. The Company’s Alberta properties have been operating smoothly since September, 2009 and with the addition of the Ferrier well, average monthly cash flow from operations has almost tripled, despite soft gas prices. The Company current working interest production is approximately100 boe/day, with another approx. 181 boe/day drilled and tested awaiting tie-in at our Pembina 102/16-29-048-08W5/00.

The Company is currently reviewing two drilling opportunities which, contingent upon finalizing mutually acceptable agreements terms, may be spud within the current quarter.

For further information on any of our projects please feel free to contact the company at 604-689-1799 or visit our web site at www.pennantenergy.com

ON BEHALF OF THE BOARD OF DIRECTORS OF
PENNANT ENERGY INC.

_”Jim Britton”______________________
Mr. Jim Britton
P. Geol. - Director

This News Release may contain forward-looking statements based on assumptions and judgments of management regarding future events or results that may prove to be inaccurate as a result of exploration and other risk factors beyond its control, and actual results may differ materially from the expected results.

BOEs may be misleading, particularily when used in isolation. A BOE conversion ratio of 6Mcf: 1 bbl is based on energy equivalency conversion method primarily applicable at the burner tip and does not present a value equivalency at the wellhead.





The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

Unternehmensinformation / Kurzprofil:
Leseranfragen:

Head Office/ Investor Relations
PO Box 10144, Pacific Centre
Suite 1818, 701 West Georgia Street
Vancouver, BC V7Y 1C6
T: 604.689.1799
F: 604.689.8199
E: info(at)pennantenergy.com



Bereitgestellt von Benutzer: irw
Datum: 25.01.2010 - 09:39 Uhr
Sprache: Deutsch
News-ID 11282
Anzahl Zeichen: 0

contact information:
Town:

Wien



Kategorie:

Business News



Diese Pressemitteilung wurde bisher 225 mal aufgerufen.


Die Pressemitteilung mit dem Titel:
"Pennant Energy Inc.: Pennant Increases Production
"
steht unter der journalistisch-redaktionellen Verantwortung von

Pennant Energy Inc. (Nachricht senden)

Beachten Sie bitte die weiteren Informationen zum Haftungsauschluß (gemäß TMG - TeleMedianGesetz) und dem Datenschutz (gemäß der DSGVO).

Pennant Energy Provides Operational Update ...

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 11/13/13 -- Pennant Energy Inc. ("Pennant" or the "Company") (TSX VENTURE: PEN) is pleased to provide an update on its Mantario oil project.Pennant has completed its first Mantario ...

Pennant Announces Private Placement ...

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 09/26/13 -- Pennant Energy Inc. (TSX VENTURE: PEN) ("Pennant" or the "Company") announces that, subject to regulatory approval, it will be conducting a non-brokered private placeme ...

Alle Meldungen von Pennant Energy Inc.



 

Werbung



Sponsoren

foodir.org The food directory für Deutschland
News zu Snacks finden Sie auf Snackeo.
Informationen für Feinsnacker finden Sie hier.

Firmenverzeichniss

Firmen die firmenpresse für ihre Pressearbeit erfolgreich nutzen
1 2 3 4 5 6 7 8 9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z