New ramp connection to the surface completed

New ramp connection to the surface completed

ID: 126642

(Thomson Reuters ONE) -


New ramp connection to the surface completed


Today, on 20 March, the two ramps that were developed from opposite directions
met, thus forming a new, continuous 1800 metre-long connection between the
surface and the 230-metre level.

The new ramp is a crucial component in improving logistics in the mine. The ramp
is a prerequisite for an early production start as it will initially be used for
truck-borne iron ore transportation to the surface and sorting plant.

Once the new ore skip is operational, the ramp will mainly be used for
transporting personnel, materials and machinery. The ramp is a key component in
achieving the planned production volume of 1.5 million tonnes of finished
product in the first quarter of 2013.

The present ramp connection between the surface and the 230-metre level, the
Ströms ramp, will eventually be phased out as its design makes it ineffective
and its location means that its function as a transport route cannot be
guaranteed.

The Press Release can be downloaded from the link below:






Press Release 20 March 2012 Dannemora Mineral:
http://hugin.info/137553/R/1595765/502570.pdf



This announcement is distributed by Thomson Reuters on behalf of
Thomson Reuters clients. The owner of this announcement warrants that:
(i) the releases contained herein are protected by copyright and
other applicable laws; and
(ii) they are solely responsible for the content, accuracy and
originality of the information contained therein.

Source: Dannemora Mineral AB via Thomson Reuters ONE
[HUG#1595765]




Unternehmensinformation / Kurzprofil:
drucken  als PDF  an Freund senden  TAKKT AG: Special dividend proposed for the 2011 financial year Net Insight Wins Prestigious SCTE 2012 Technological Innovation Award
Bereitgestellt von Benutzer: hugin
Datum: 20.03.2012 - 13:21 Uhr
Sprache: Deutsch
News-ID 126642
Anzahl Zeichen: 1867

contact information:
Town:

Österbybruk



Kategorie:

Business News



Diese Pressemitteilung wurde bisher 158 mal aufgerufen.


Die Pressemitteilung mit dem Titel:
"New ramp connection to the surface completed"
steht unter der journalistisch-redaktionellen Verantwortung von

Dannemora Mineral AB (Nachricht senden)

Beachten Sie bitte die weiteren Informationen zum Haftungsauschluß (gemäß TMG - TeleMedianGesetz) und dem Datenschutz (gemäß der DSGVO).

Dannemora Mineral AB: Press Release 13 November 2009 ...

AGREEMENT SIGNED WITH VOESTALPINE FOR TRIAL DELIVERY OF IRON ORE Dannemora has signed an agreement with Austrian steel company Voestalpine AG for the delivery of approx. 10,000 tonnes of iron ore products. The ore will be shipped from the port of Ha ...

Dannemora Mineral AB: Interim Report January - June 2009 ...

* With global demand for steel having stabilised in the second quarter, many steel companies entered the third quarter in a position to raise their prices. * Iron ore imports to China hit a record high in the first half of 2009, increa ...

Alle Meldungen von Dannemora Mineral AB



 

Werbung



Sponsoren

foodir.org The food directory für Deutschland
News zu Snacks finden Sie auf Snackeo.
Informationen für Feinsnacker finden Sie hier.

Firmenverzeichniss

Firmen die firmenpresse für ihre Pressearbeit erfolgreich nutzen
1 2 3 4 5 6 7 8 9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z