Centerra Gold-Kumtor Mine Reserves Increase 58% to 9.7 Million Ounces of Gold

Centerra Gold-Kumtor Mine Reserves Increase 58% to 9.7 Million Ounces of Gold

ID: 200830

5 Year Extension of the Life-of-Mine to 2026


(firmenpresse) - TORONTO, ONTARIO -- (Marketwire) -- 11/07/12 -- Centerra Gold Inc. (TSX: CG)

All figures are in United States dollars

Centerra Gold Inc. announces the results of its technical and financial study regarding expanding the Central open pit at the Kumtor mine in the Kyrgyz Republic.

An estimated 3.6 million ounces of proven and probable reserves have been added with the new LOM. After accounting for processing of 172,000 ounces of contained gold to September 30, 2012, Kumtor's proven and probable mineral reserves now total 9.7 million ounces of contained gold. The new LOM plan is expected to provide a more consistent quarterly production profile after 2013 and is based only on open-pit mineral reserves. There continues to be an opportunity for underground mining beneath the new LOM open pit that will require further exploration drilling and completion of detailed technical studies (please see plan maps, longitudinal and cross sections, available at: ).

Using a gold price of $1,350 per ounce and a discount rate of 8%, the new Kumtor open-pit LOM has an NPV of approximately $1.9 billion. The new LOM plan is expected to result in the payment of approximately $1.5 billion in revenue-based taxes, based on $1,350 per ounce gold, along with significant other benefits to the Kyrgyz Republic such as continued local employment, extended procurement of local goods and services and continued support for community sustainable development.

The new Kumtor reserves and LOM incorporate the revised production guidance for the fourth quarter of 2012 as described in the Company's third quarter news release issued on November 7, 2012.

Ian Atkinson, President and CEO of Centerra Gold stated, "We are very excited with the outcome of the technical and financial study of expanding the limits of the ultimate Central open pit at Kumtor. The new KS-13 open pit significantly increases the NPV of the Kumtor project, as significantly to the open pit reserves and has extended Kumtor's mine life. The study optimized the mine plan to maximize the value at a lower risk profile. The increase in the open pit reserves is entirely within the Central Pit and is a result of the successful exploration drilling of the SB Zone over the last three years, which has doubled the strike length of the SB Zone and extended the SB Zone resource down dip, resulting in an expansion of resources. This expansion of the resources, in conjunction with the decision made in March of this year to unload the ice above the Southeast highwall of the Central Pit, has created the opportunity to expand the Central Pit with the resulting significant increase in reserves, extension of the mine life and increase in the project NPV. The increase in reserves and mine life will provide significant tax revenue to the Kyrgyz Republic of approximately $1.5 billion based on a gold price of $1,350, along with significant employment, community development and other benefits over the life of the mine."





Kumtor's proven and probable reserves have increased to 9.7 million contained ounces of gold with the expanded pit, which converts 1.2 million ounces of SB underground inferred resource into reserves. The expanded open pit captures an additional 2.0 million ounces in reserves which were below the underground cut-off grade of 6.0 g/t. While the expanded pit encompasses a significant part of the existing SB inferred resources, the option of developing an underground project in the Stockwork Zone and the deeper extensions of the SB Zone has been maintained. Currently, close to 1.9 million contained ounces of inferred high-grade underground resources remain below the expanded KS-13 pit bottom. Exploration continues to test the down dip extension of the SB Zone. The Company will assess the opportunities to develop both the Stockwork and SB Zones underground once mining of the SB Zone is completed in the open pit.

The decision to invest in the development of the underground decline was made in late-2006 to explore and develop the down-dip extension of the high-grade SB Zone. Since that time a number of factors and events including exploration drilling from surface and underground, in particular since 2009, which has expanded the resource significantly, the substantial increase in the gold price and the decision to unload the ice in the high movement area announced in March 2012, created the opportunity for an expanded open pit which has generated a significant increase in the value of the Kumtor project. The new KS-13 open pit design will consume most of the existing underground infrastructure and will therefore require an accounting charge (de-recognition) of between $175 million and $190 million, which the Company will recognize in the fourth quarter of 2012.

Total capital required to develop the new LOM at Kumtor is $726 million of which $169 million is expansion capital related to the purchase of additional mining equipment, expansion of the tailings management facility and the expansion of the mill. Sustaining capital increased to $557 million due to the expanded fleet size and increased mine life. The LOM operating and capital cost including pre-stripping capital is $728 per ounce.

The new Kumtor LOM plan is expected to produce the following cash flow:

Sensitivities to the gold price and discount rate are as follows:

An updated National Instrument 43-101 technical report for the Kumtor project will be filed on SEDAR at and the Company's website at before December 21, 2012.

Kumtor KS-13 Life-of-Mine Plan

The new Kumtor LOM plan is based only on open pit reserves and has no provision for production from the underground resources.



Kumtor Underground

Kumtor Reserves and Resources

Reserves

At the Kumtor mine an estimated 3.6 million contained ounces of proven and probable reserves have been added to reserves representing an increase of 58% (before accounting for production in 2012). After accounting for processing of 172,000 ounces of contained gold to September 30, 2012, Kumtor's proven and probable mineral reserves now total 9.7 million ounces of contained gold as at September 30, 2012, compared to 6.3 million ounces as at December 31, 2011. Based on these estimates, the open pit mine-life at Kumtor will be extended by 5 years to 2026.

The increase in the open pit reserves is entirely within the Central Pit. The successful exploration drilling of the SB Zone over the last three years has doubled the strike length of the SB Zone and extended the SB Zone resource down dip, resulting in an expansion of the resources. The resource expansion, in conjunction with the decision made in March of this year to unload the ice above the Southeast highwall of the Central Pit, has created the opportunity to expand the Central Pit with the resulting significant increase in reserves and the extension of the mine life.

The expansion of the open pit converted 2.0 million ounces of contained gold of measured and indicated open pit resources, 1.2 million contained ounces of gold of the high-grade inferred SB Zone underground resource and 92,000 ounces of contained gold of the inferred underground Stockwork Zone resource into the new open pit proven and probable reserves. In addition, successful exploration drilling in 2012 added a further 355,000 ounces of contained gold to reserves.

The Kumtor KS-13 LOM plan has been revised and extended a further five years to 2026. Kumtor's life-of-mine plan is based only on open pit reserves and no provision has been made for production from open pit or underground resources.

A gold price of $1,350 per ounce was used for reserve estimates at September 30, 2012, compared to $1,200 per ounce at December 31, 2011. The increase in gold price has been offset by the increase in costs and has had minimal impact on reserves.

Resources

As of September 30, 2012, Kumtor's measured and indicated resources total 2.7 million ounces of contained gold, compared to 4.8 million contained ounces as of December 31, 2011. The decrease of 2.1 million ounces is largely attributable to the significant conversion of resources to reserves as a result of the expanded open pit at Kumtor. The expansion of the open pit converted 2.0 million ounces of contained gold of measured and indicated open pit resources to reserves. Exploration drilling in 2012 added 408,000 ounces of contained gold to measured and indicated resources and 21,000 ounces of contained gold of the inferred open pit resources were upgraded to measured and indicated resources. These increases in the measured and indicated open pit resources were offset by a reduction of 678,000 ounces of contained gold because of the smaller resource limiting shell used for resource estimation.

In addition, as a result of detailed delineation drilling completed in the underground Stockwork Zone in the first nine months of 2012, 121,000 ounces of contained gold were upgraded to high-grade underground Stockwork Zone indicated resources.

Kumtor's inferred resources decreased by 482,000 contained ounces of gold from 2011 year-end, to total 2.6 million contained ounces of gold at September 30, 2012, which includes 1.8 million contained ounces of high-grade underground inferred resources in the SB and Stockwork Zones. The inferred resources in the high-grade underground SB Zone decreased by 0.6 million contained ounces to 1.2 million contained ounces of gold with an average grade of 11.2 g/t. This reduction is the result of the expansion of the Central Pit, which captured 1.2 million ounces of contained gold that were previously classified as part of the high-grade underground SB Zone inferred resources. These inferred resources are now within the new open pit design and therefore, are included in the Kumtor Central Pit as probable reserves. This reduction in inferred resources has been partially offset by the positive exploration results, which has extended the SB Zone to the southwest and northeast adding 572,000 contained ounces of gold to the high-grade underground SB Zone inferred resource, which remains open at depth.

In addition, the high-grade underground Stockwork Zone inferred resource increased by 76,000 ounces of contained gold to 705,000 ounces of contained gold with an average grade of 11.0 g/t. Underground drilling in the Stockwork Zone added 168,000 contained ounces of gold to the inferred resources which was partially offset by the conversion of 121,000 contained ounces of gold to high-grade Stockwork Zone indicated resources with an average grade of 10.7 g/t. Of the 165,000 ounces of contained gold in the Central Pit inferred resources, 113,000 ounces lie within the expanded pit shell and may be converted to reserves with additional drilling.

The estimation parameters (modeling), resource classification, and cut off grades used for the KS-13 model are substantially the same as those used in previous models and are described in the Kumtor Technical Report dated March 22, 2011.

Material Assumptions & Risks

Material assumptions or factors that have been used in estimating reserves and resources and in the revised Kumtor life-of-mine plan include the following:

The assumed diesel price of $0.80/litre at Kumtor assumes that no Russian export duty will be paid on the fuel exports from Russia to the Kyrgyz Republic. Diesel fuel is sourced from separate Russian suppliers and only loosely correlates with world oil prices.

Other important assumptions (and corresponding risks) that are implicit in the Company's reserve and resource estimates and the revised Kumtor life-of-mine plan are as follows:

Centerra has assessed the cost (premium) and benefits (including the amount of coverage) of continuing its political risk insurance in relation to the Kumtor project and has concluded that continued coverage is no longer justified. As a result, Centerra has decided not to pursue the renewal of such insurance. Centerra's prior coverage expired on November 5, 2012. Therefore, any losses Centerra may suffer with respect to its foreign investments, including in the Kyrgyz Republic, would not be covered and such losses could have an adverse impact on Centerra's future cash flows, earnings, results of operations and financial condition.

Production and cost forecasts and capital estimates are forward-looking information and are based on key assumptions and subject to material risk factors.

If any event arising from these risks occurs, the Company's business, prospects, financial condition, results of operations or cash flows could be adversely affected. Additional risks and uncertainties not currently known to the Company, or that are currently deemed immaterial, may also materially and adversely affect the Company's business operations, prospects, financial condition, and results of operations or cash flows. See the sections entitled "Risk Factors" in the Company's most recently filed Annual Information Form (the "2011 Annual Information Form"), available on SEDAR at and see also the discussion below under the heading "Cautionary Note Regarding Forward-looking Information".

Non-GAAP Measures

This news release presents information about free cash flow and free cash flow per ounce of gold. Free cash flow and free cash flow per ounce are non-GAAP measures. Free cash flow per ounce of gold is calculated by dividing free cash flow by gold ounces produced. Free cash flow is calculated by subtracting from revenue, operating costs (such as mining, processing, administration and mine exploration), pre-strip capital, capital and revenue-based taxes, but excludes depreciation, depletion and amortization. Free cash flow per ounce produced has been included because certain investors use this information to assess the cash that Centerra is able to generate after laying out the funds required to maintain or expand its asset base. Free cash flow is important because it allows the company to pursue opportunities that enhance shareholder value.

Operating cost, pre-stripping and capital per ounce of gold is calculated by dividing operating cost, pre-stripping and capital by gold ounces produced. Operating cost, pre-stripping and capital includes operating costs described above, pre-stripping capital and capital, but excludes revenue-based taxes, depreciation, depletion and amortization.

These non-GAAP measures do not have a standardized meaning or a consistent basis of calculation prescribed by Canadian accounting standards. Investors are cautioned that free cash flow, free cash flow per ounce of gold, operating costs per ounce of gold, pre-stripping capital per ounce of gold, and capital per ounce of gold should not be considered in isolation. The Company's method of calculating such measures may differ from the methods used by other entities and, accordingly, such information may not be comparable to similarly titled measures used by other entities.

Qualified Person & QA/QC

The resource and reserve estimates, life-of-mine plan and other scientific and technical information in this news release and on Centerra's website were prepared in accordance with the standards of the Canadian Institute of Mining, Metallurgy and Petroleum and National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") and were reviewed, verified and compiled by Centerra's geological and mining staff under the supervision of Dan Redmond, Ontario Professional Geoscientist, Centerra's Director, Technical Services - Mining, who is the qualified person for the purpose of NI 43-101.

Sample preparation, analytical techniques, laboratories used and quality assurance-quality control protocols used during the drilling programs at the Kumtor site are described in Centerra's 2011 Annual Information Form and the technical report dated March 22, 2011. The Kumtor deposit is described in Centerra's 2011 Annual Information Form.

An updated technical report prepared in accordance with NI 43-101 will be filed on SEDAR at before December 21, 2012. The technical report will describe the exploration history, geology and style of gold mineralization at the Kumtor deposit.

Cautionary Note Regarding Forward-looking Information

Information contained in this news release and the documents referred to herein which are not statements of historical facts, may be "forward-looking information" for the purposes of Canadian securities laws. Such forward-looking information involves risks, uncertainties and other factors that could cause actual results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. The words "believe", "expect", "anticipate", "contemplate", "target", "plan", "intends", "continue", "budget", "estimate", "may", "will", "schedule", "opportunity", and similar expressions identify forward-looking information.

These forward-looking statements relate to, among other things, the Company's projected production, operating costs and capital expenditures, and unit costs for the revised Kumtor LOM; mineral reserves and resources; mine life; milling rates; metallurgical recovery; net present value; sensitivities; Centerra's statements regarding the potential for future underground mining beneath the new LOM open pit; financial measures, including free cash flow calculations; tax rates; the expected benefits to the Kyrgyz Republic over the expanded life of mine; the Company's ability to successfully manage the ice and waste movement at Kumtor; the outcome of the review by the State Commission and interagency commissions on Kumtor's compliance with Kyrgyz operational and environmental laws and regulations and community standards, and other matters raised by the Commission Report and resolutions passed by the Parliament and the Government of the Kyrgyz Republic, (including without limitation, the resolution of land-use matters affecting the Kumtor project, the environmental review of the Karasay and Koendy license areas, the assertions made by the Kyrgyz Republic Social Fund regarding historical social fund contributions and the continued effectiveness of the Restated Project Agreements); expected trends in the gold market, including with respect to costs of gold production; and the business and political environment and business prospects and opportunities.

Forward-looking information is necessarily based upon a number of estimates and assumptions that, while considered reasonable by Centerra, are inherently subject to significant political, business, economic and competitive uncertainties and contingencies. Known and unknown factors could cause actual results to differ materially from those projected in the forward-looking information. Material assumptions used to estimate mineral reserves and resources and to project future production, operating and capital costs for the LOM are discussed under "Material Assumptions and Risks" in this news release.

Factors that could cause actual results or events to differ materially from current expectations include, among other things: the sensitivity of the Company's business to the volatility of gold prices; the political risks associated with the Kumtor project; the impact of changes in, or to the more aggressive enforcement of, laws, regulations and government practices in the jurisdictions in which the Company operates; ground movements at the Kumtor project; waste and ice movement at the Kumtor project; the success of the Company's future exploration and development activities, including the financial and political risks inherent in carrying out exploration activities; equipment breakdown; the adequacy of the Company's insurance to mitigate operational risks; the impact of changes to, or the increased enforcement of, environmental laws and regulations relating to the Company's operations; the Company's ability to replace its mineral reserves; the occurrence of any labour unrest or disturbance and the ability of the Company to successfully re-negotiate collective agreements when required, including specifically the Kumtor collective agreement that expires at the end of 2012; litigation; the imprecision of the Company's mineral reserves and resources estimates and the assumptions they rely on; the accuracy of the Company's production, operating cost and capital expenditure estimates; environmental, health and safety risks; defects in title in connection with the Company's properties; the impact of restrictive covenants in the Company's revolving credit facility; seismic activity in the vicinity of the Company's operations in the Kyrgyz Republic; long lead times required for equipment and supplies given the remote location of the Company's properties; the Company's ability to enforce its legal rights; the Company's ability to accurately predict decommissioning and reclamation costs; the Company's ability to obtain future financing; the impact of global financial conditions; the impact of currency fluctuations; the effect of market conditions on the Company's short-term investments; the Company's ability to attract and retain qualified personnel; the Company's ability to make payments including any payments of principal and interest on the Company's debt facilities depends on the cash flow of its subsidiaries; risks associated with the conduct of joint ventures; risks associated with having a significant shareholder; and possible director conflicts of interest. There may be other factors that cause results, assumptions, performance, achievements, prospects or opportunities in future periods not to be as anticipated, estimated or intended. See "Risk Factors" in the Company's 2011 Annual Information Form available on SEDAR at .

Furthermore, market price fluctuations in gold, as well as increased capital or production costs or reduced recovery rates may render ore reserves containing lower grades of mineralization uneconomic and may ultimately result in a restatement of reserves. The extent to which resources may ultimately be reclassified as proven or probable reserves is dependent upon the demonstration of their profitable recovery. Economic and technological factors which may change over time always influence the evaluation of reserves or resources. Centerra has not adjusted mineral resource figures in consideration of these risks and, therefore, Centerra can give no assurances that any mineral resource estimate will ultimately be reclassified as proven and probable reserves.

Reserve and resource figures are estimates and Centerra can provide no assurances that the indicated levels of gold will be produced or that Centerra will receive the gold price assumed in determining its reserves. Such estimates are expressions of judgment based on knowledge, mining experience, analysis of drilling results and industry practices. Valid estimates made at a given time may significantly change when new information becomes available. While Centerra believes that these reserve and resource estimates are well established and the best estimates of Centerra's management, by their nature reserve and resource estimates are imprecise and depend, to a certain extent, upon analysis of drilling results and statistical inferences which may ultimately prove unreliable.

Centerra has not adjusted resource figures in consideration of these risks and, therefore, Centerra can give no assurances that any of the estimated resources will ultimately be reclassified as proven and probable reserves or incorporated into future production guidance. If Centerra's reserve or resource estimates or production guidance for its gold properties are inaccurate or are reduced in the future, this could have an adverse impact on Centerra's future cash flows, earnings, results of operations and financial condition. Centerra estimates the future mine life of its operations and provides production guidance in respect of its mining operations. Centerra can give no assurance that mine life estimates will be achieved or that actual production will not differ materially from its guidance. Failure to achieve estimates or production guidance could have an adverse impact on the market price of Centerra's shares, Centerra's future cash flows, earnings, results of operations and financial condition.

Mineral resources are not mineral reserves, and do not have demonstrated economic viability, but do have reasonable prospects for economic extraction. Measured and indicated resources are sufficiently well defined to allow geological and grade continuity to be reasonably assumed and permit the application of technical and economic parameters in assessing the economic viability of the resource. Inferred resources are estimated on limited information not sufficient to verify geological and grade continuity or to allow technical and economic parameters to be applied. Interred resources are too speculative geologically to have economic considerations applied to them to enable them to be categorized as mineral reserves. There is no certainty that mineral resources of any category can be upgraded to mineral reserves through continued exploration.

There can be no assurances that forward-looking information and statements will prove to be accurate, as many factors and future events, both known and unknown could cause actual results, performance or achievements to vary or differ materially, from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements contained herein or incorporated by reference. Accordingly, all such factors should be considered carefully when making decisions with respect to Centerra, and prospective investors should not place undue reliance on forward-looking information. Forward-looking information is as of November 7, 2012. Centerra assumes no obligation to update or revise forward-looking information to reflect changes in assumptions, changes in circumstances or any other events affecting such forward-looking information, except as required by applicable law.

About Centerra

Centerra Gold Inc. is a gold mining company focused on operating, developing, exploring and acquiring gold properties primarily in Asia, the former Soviet Union and other emerging markets worldwide. Centerra is the largest Western-based gold producer in Central Asia. Centerra's shares trade on the Toronto Stock Exchange (TSX) under the symbol CG. The Company is based in Toronto, Ontario, Canada.

Conference Call

Centerra invites you to join its 2012 third quarter conference call on November 8, 2012 at 11:00am Eastern Time. The call is open to all investors and the media. To join the call, please dial toll-free in North America (800) 624-1279 or International participants dial +1 (303) 223-2683. Alternatively, an audio feed web cast will be available on . A recording of the call will be available on shortly after the call and via telephone until midnight on November 15, 2012 by calling (416) 626-4100 or (800) 558-5253 and using passcode 21606487.

Additional information on Centerra is available on the Company's web site at and at SEDAR at .



Contacts:
Centerra Gold Inc.
John W. Pearson
Vice President, Investor Relations
(416) 204-1241

Weitere Infos zu dieser Pressemeldung:

Themen in dieser Pressemitteilung:


Unternehmensinformation / Kurzprofil:
drucken  als PDF  an Freund senden  Silver Standard Reports Third Quarter 2012 Financial Results and Further Exploration Results at Pirquitas Centerra Gold Reports Third Quarter Results
Bereitgestellt von Benutzer: MARKETWIRE
Datum: 08.11.2012 - 03:38 Uhr
Sprache: Deutsch
News-ID 200830
Anzahl Zeichen: 0

contact information:
Town:

TORONTO, ONTARIO



Kategorie:

Mining & Metals



Diese Pressemitteilung wurde bisher 277 mal aufgerufen.


Die Pressemitteilung mit dem Titel:
"Centerra Gold-Kumtor Mine Reserves Increase 58% to 9.7 Million Ounces of Gold"
steht unter der journalistisch-redaktionellen Verantwortung von

Centerra Gold Inc. (Nachricht senden)

Beachten Sie bitte die weiteren Informationen zum Haftungsauschluß (gemäß TMG - TeleMedianGesetz) und dem Datenschutz (gemäß der DSGVO).

Centerra Gold Reports Third Quarter Results ...

TORONTO, ONTARIO -- (Marketwired) -- 10/29/14 -- Centerra Gold Inc. (TSX: CG) -This news release contains forward-looking information that is subject to the risk factors and assumptions set out on page 20 and in the Cautionary Note Regarding Forwar ...

Alle Meldungen von Centerra Gold Inc.



 

Werbung



Facebook

Sponsoren

foodir.org The food directory für Deutschland
Informationen für Feinsnacker finden Sie hier.

Firmenverzeichniss

Firmen die firmenpresse für ihre Pressearbeit erfolgreich nutzen
1 2 3 4 5 6 7 8 9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z