Altima Announces Construction of New Chambers Alberta Area Pipeline and Facilities and Updates Chamb

Altima Announces Construction of New Chambers Alberta Area Pipeline and Facilities and Updates Chambers, Alberta Project

ID: 301405

(firmenpresse) -
Altima Announces Construction of New Chambers Alberta Area Pipeline and Facilities and Updates Chambers, Alberta Project

September 30, 2013 - Altima Resources Ltd. (TSX-V: ARH / FSE: AKC / OTC Pink: ARSLF) announces it has commenced construction of a new 3.78 kilometer pipeline (the “Line”) and facility to connect the COPOL HZ 14-15-41-11 W5M well (Refer to News Release September 5, 2013) to the ConocoPhillips Canada compressor facility (the “Facilities”) located at 09-04-041-11 W5M. Through a Participation Agreement (the “Agreement”) between Acumen Energy Partners Inc. (“Acumen”), and the Company, Acumen has been granted the right to earn a 5% working interest (the “Working Interest”) in the Company’s 30% working interest in the COPOL ET AL HZ CHAMERS 14-15-41-11 W5M well (the “Well”) and the associated Pooled Lands located in the Chambers-Ferrier area of the Western Canada Sedimentary Basin, Alberta (refer to News Release August 26, 2013 for details). As per the Agreement, Acumen and the Company will construct the Line and Facilities, which are anticipated to be completed and the Well placed on production in late October.

Upon completion, the Company and Acumen will receive 100% of the revenue relating to a penalty payout agreement with ConocoPhillips Canada. After which, the payout of the penalty provides that, the Company will retain a 25% working interest in the Well and joint lands (refer to News Release January 24, 2013).

Additionally, the Company is proceeding to survey and License two additional offset wells (the “Wells”) to the Altima Chambers 15-35-41-11 W5M well, which was placed on production September 4, 2013. Both offset wells will take advantage of the recently completed pipeline of approximately 6.4 kilometers infrastructure, which tied the 15-35 well to the Baytex header located at 4-4-42-10 W5M (Reference News Release September 3, 2013).





Under a joint venture agreement with Whistler Oil and Gas Pty. Ltd., Whistler has the right to participate in the two offset wells (Reference News Release January 24, 2013). The Company anticipates the drilling of the Wells to commence in Q1, 2014.

ON BEHALF OF THE BOARD

SIGNED: “Rick Switzer”

Rick Switzer, President & CEO
Contact: (604) 718 2800 Ext 301

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release includes certain forward-looking statements or information. All statements other than statements of historical fact included in this release are forward-looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's plans or expectations include risks relating to: availability of capital and financing required to continue the Company's exploration and development plans; general economic, market or business conditions; the actual results of current and planned exploration activities; fluctuating commodity prices; risks associated with property option agreements, leases, joint ventures and the ability to conclude joint venture agreements on favorable terms; possibility of accidents, equipment breakdowns and delays during exploration; exploration cost overruns or unanticipated costs and expenses; regulatory changes and restrictions including in relation to environmental liability; timeliness of government or regulatory approvals and other risks detailed herein and from time to time in the filings made by the Company with securities regulators. The Company expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise except as otherwise required by applicable securities legislation.

Unternehmensinformation / Kurzprofil:
Leseranfragen:

Altima Resources Ltd.
Box 4 Suite 303
595 Howe Street
Vancouver, BC
Kanada V6C 2T5

Tel.: +1 (604) 336-8610
Fax: +1 (604) 718-2808

E-Mail: info(at)altimaresources.com



drucken  als PDF  an Freund senden  Medigene announces market launch of Veregen® in Taiwan PVA TePla AG: baSiC-T: New system generation - silicon carbide (SiC) crystals for mass production
Bereitgestellt von Benutzer: irw
Datum: 01.10.2013 - 08:07 Uhr
Sprache: Deutsch
News-ID 301405
Anzahl Zeichen: 4325

contact information:
Town:

Wien



Kategorie:

Business News



Diese Pressemitteilung wurde bisher 238 mal aufgerufen.


Die Pressemitteilung mit dem Titel:
"Altima Announces Construction of New Chambers Alberta Area Pipeline and Facilities and Updates Chambers, Alberta Project
"
steht unter der journalistisch-redaktionellen Verantwortung von

Altima Resources Ltd. (Nachricht senden)

Beachten Sie bitte die weiteren Informationen zum Haftungsauschluß (gemäß TMG - TeleMedianGesetz) und dem Datenschutz (gemäß der DSGVO).


Alle Meldungen von Altima Resources Ltd.



 

Werbung



Facebook

Sponsoren

foodir.org The food directory für Deutschland
Informationen für Feinsnacker finden Sie hier.

Firmenverzeichniss

Firmen die firmenpresse für ihre Pressearbeit erfolgreich nutzen
1 2 3 4 5 6 7 8 9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z