Rockridge Drilling Intersects 213 g/t Gold Over 4m at Fatou Gold Project, Mali, West Africa

Rockridge Drilling Intersects 213 g/t Gold Over 4m at Fatou Gold Project, Mali, West Africa

ID: 36134

(firmenpresse) - VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 07/20/11 -- Rockridge Capital Corp. (TSX VENTURE: RRC) ("Rockridge"; the "Company") is pleased to announce further results of its diamond drilling programme at the 250 km2 Fatou Gold Project, southern Mali.

Highlight results from this second half of the Spring 2011 diamond drill program include 213.97 g/t gold over 4 metres in DDF 010; 13.39 g/t gold over 3 metres in DDF 016 and 8.00 g/t gold over 3 metres in DDF 012. This announcement reports the results of holes DDF-009 to DDF-020.

Visible gold was observed within white quartz veins in drill logs DDF-010, DDF-012, DDF-014, DDF-015, DDF-016, DDF-017, DDF-018 and DDF-019 that resemble in places multiple sub-parallel stockworks. Holes were targeted beneath a north-south trend of old artisinal workings with early diamond drill results (DDF-002 to DDF-008) reporting significant intersections of 46.65 g/t gold over 2.0 metres, and 4.2 g/t gold over 12.0 metres. A map of the drill collar locations is attached below and additional maps and sections are available on the company website .

The current drilling programme has completed 87 Reverse Circulation (RC) and 36 Diamond Drill (DD) holes totalling 8,215m (RC) and 10,729m (DD) since the start of the campaign.

A total of 9,860m of RC drilling has been planned and is currently being drilled on geochemical anomalies in the Digan North (62 holes), Digan Central (19 holes) and Digan South areas (20 holes), 7 km west of the main Fatou artisinal workings.

Six planned diamond drill holes will be drilled in the Finiko area, 8 km SE of Fatou, based on previous historical soil anomalies and limited RAB drilling. The results of both the RC and DD programmes will give valuable information on lithological type, mineralisation, host rocks, geological contacts, thus facilitating the recognition of discrete conductive features (eg. graphites) that the upcoming VTEM geophysical survey may pick up.





The helicopter-borne VTEM electromagnetic and magnetic survey will be flown in July 2011 on a 100m east-west regional spacing over the entire prospect area and will improve the geological and structural framework of the project area and guide optimum target selection based on surveys run in Mali to date.

Mr. Peter Camden Smith is the Qualified Person for the Company under NI 43-101. Mr. Camden-Smith (M.Sc., G.D.Eng., M.B.L., Pr.Sci.Nat) is a professional geologist with more than 30 years experience. Mr. Camden Smith replaces Mr. Lorne Warner, P. Geo, who was the Qualified Person for the Company under NI 43-101 up until June 2011.

All samples were collected on site and sent to ALS-Chemex in Bamako for analysis. The company inserts a blank and requests a duplicate sample be run in every batch of 20 samples. In addition, the lab inserts in-house blanks, standards, and duplicates with each shipment. Data that falls outside the control limits are checked and repeated as necessary. An average grade of the original and the duplicate samples is used where it is applicable, and a cut-off grade of 0.5 g/t is used as a general rule. The current boreholes are orientated based on a base line. In addition, the half core closest to the sampler is taken after cutting the core, except where there is visible gold. Given the high nugget effects observed in the difference in grades between the original and duplicate samples of high grade intersections (i.e. above 50 g/t) a recommendation has been made to investigate the most reliable method of achieving representative results for this kind of deposit. It is noted that in geostatistical evaluations on Birrimian gold deposits with similar affinities to the Fatou Gold Project a top cut off ranging between 30 g/t to 250 g/t is applied.

Please visit our website at .

ON BEHALF OF THE BOARD OF DIRECTORS OF ROCKRIDGE CAPITAL CORP.

Karl Kottmeier, President

To view the Map associated with this release, please visit the following link:

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Exchange) accepts responsibility for the adequacy or accuracy of this release.



Contacts:
Rockridge Capital Corp.
Karl Kottmeier
President
(604) 678 8941

Rockridge Capital Corp.
Kirk Gamley
VP Corporate Development
(604) 678 8941
(604) 689 7442 (FAX)

Weitere Infos zu dieser Pressemeldung:

Themen in dieser Pressemitteilung:


Unternehmensinformation / Kurzprofil:
drucken  als PDF  an Freund senden  Gold Reach Resources Progress Report at Ootsa Lake B.C. (TSX VENTURE: GRV) Caribou and Alix Increase Land Position Around Wellgreen Project, Yukon
Bereitgestellt von Benutzer: MARKET WIRE
Datum: 20.07.2011 - 11:00 Uhr
Sprache: Deutsch
News-ID 36134
Anzahl Zeichen: 0

contact information:
Town:

VANCOUVER, BRITISH COLUMBIA



Kategorie:

Mining & Metals



Diese Pressemitteilung wurde bisher 261 mal aufgerufen.


Die Pressemitteilung mit dem Titel:
"Rockridge Drilling Intersects 213 g/t Gold Over 4m at Fatou Gold Project, Mali, West Africa"
steht unter der journalistisch-redaktionellen Verantwortung von

Rockridge Capital Corp. (Nachricht senden)

Beachten Sie bitte die weiteren Informationen zum Haftungsauschluß (gemäß TMG - TeleMedianGesetz) und dem Datenschutz (gemäß der DSGVO).

Rockridge Closes $1,260,000 Private Placement ...

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 05/15/13 -- Rockridge Capital Corp. (TSX VENTURE: RRC) ("Rockridge" or the "Company") is pleased to announce that the Company has closed the non-brokered private placement, issuing ...

Alle Meldungen von Rockridge Capital Corp.



 

Werbung



Facebook

Sponsoren

foodir.org The food directory für Deutschland
Informationen für Feinsnacker finden Sie hier.

Firmenverzeichniss

Firmen die firmenpresse für ihre Pressearbeit erfolgreich nutzen
1 2 3 4 5 6 7 8 9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z