Metanor Reports Larger Intersection With 6.14 g/t Over 15 Meters at Bachelor Mine

Metanor Reports Larger Intersection With 6.14 g/t Over 15 Meters at Bachelor Mine

ID: 384572

(firmenpresse) - VAL-D'OR, QUEBEC -- (Marketwired) -- 04/09/15 -- Metanor Resources Inc. ("Metanor") (TSX VENTURE: MTO) is pleased to report larger intersections in the holes 13-154 and 13-160 than was previously reported March 30th 2015.

More assay results received since such date have confirmed a larger intersection in the sector. The drill campaign is continuing from the drill bay on level 13 to the west between levels 13 and 14. The mine design and development in this sector is now underway as the current excavations are within 30 meters.

Updated results

The true width is between 50 and 75% of the core length obtained in diamond drill holes. The cap-off grade used in the analysis is 51.5 g/T or 1.5 oz Au. The samples were assayed by fire-assay at the Metanor assay lab. The quality control program of the assay results (QA QC) adopted by Metanor includes a minimum of 10% of controlled assays being conducted as well as verification by an independent external assay lab.

Qualified Person

Pascal Hamelin, P.Eng, Vice-president of Operations, is the Qualified Person under NI 43-101 responsible for reviewing and approving the technical information contained in this news release.

Cautionary Language and Forward-Looking Statements

This press release includes certain statements that may be deemed "forward-looking statements". All statements in this discussion, other than statements of historical facts, that address future exploration drilling, exploration activities, anticipated metal production, internal rate of return, estimated ore grades, commencement of production estimates and projected exploration and capital expenditures (including costs and other estimates upon which such projections are based) and events or developments that the Company expects, are forward looking statements. Although the Company believes the expectations expressed in such forward looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, and actual results or developments may differ materially from those in forward-looking statements.





Neither the TSX Venture Exchange, nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release.



Contacts:
Ronald Perry
Vice-President
514-262-8286

Weitere Infos zu dieser Pressemeldung:

Themen in dieser Pressemitteilung:


Unternehmensinformation / Kurzprofil:
drucken  als PDF  an Freund senden  Golden Tag Obtains Two Year Extension to March 24, 2017 to Its 60% Earn-in San Diego Property, Mexico Rubicon Minerals Announces Closing of C$30.2 Million Flow-Through Financing
Bereitgestellt von Benutzer: Marketwired
Datum: 09.04.2015 - 12:53 Uhr
Sprache: Deutsch
News-ID 384572
Anzahl Zeichen: 0

contact information:
Town:

VAL-D'OR, QUEBEC



Kategorie:

Mining & Metals



Diese Pressemitteilung wurde bisher 134 mal aufgerufen.


Die Pressemitteilung mit dem Titel:
"Metanor Reports Larger Intersection With 6.14 g/t Over 15 Meters at Bachelor Mine"
steht unter der journalistisch-redaktionellen Verantwortung von

Metanor Resources Inc. (Nachricht senden)

Beachten Sie bitte die weiteren Informationen zum Haftungsauschluß (gemäß TMG - TeleMedianGesetz) und dem Datenschutz (gemäß der DSGVO).


Alle Meldungen von Metanor Resources Inc.



 

Werbung



Facebook

Sponsoren

foodir.org The food directory für Deutschland
News zu Snacks finden Sie auf Snackeo.
Informationen für Feinsnacker finden Sie hier.

Firmenverzeichniss

Firmen die firmenpresse für ihre Pressearbeit erfolgreich nutzen
1 2 3 4 5 6 7 8 9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z