Minera Alamos Inc. Provides Plans Regarding La Fortuna Gold Project

Minera Alamos Inc. Provides Plans Regarding La Fortuna Gold Project

ID: 449946

(firmenpresse) - TORONTO, ONTARIO -- (Marketwired) -- 02/10/16 -- Minera Alamos Inc. (TSX VENTURE: MAI) (the "Company" or "Minera Alamos") today provided additional details regarding their acquisition of the La Fortuna Gold Project located in Durango Mexico ("La Fortuna") announced in their press release dated January 18, 2016.

"One of the primary factors in our decision to acquire La Fortuna is its advanced stage of development," said Chris Frostad, Minera Alamos' CEO. "The scope of previous test work that is available gives us a significant head start on the development timeline. We expect to be able to complete a Preliminary Economic Assessment ("PEA") of La Fortuna by this summer."

"The ability to pre-concentrate the gold mineralization at La Fortuna using crushed rock sorting equipment presents a number of interesting opportunities for the project", said Darren Koningen, President of Minera Alamos. "It appears that sorting equipment can effectively reject coarse crushed rock containing less than 0.6-0.8 g/t gold which would reduce the amount of material needing to be processed for gold recovery by 75% or more. Obviously this could have significant and positive impact the overall project economics."

Highlights:

La Fortuna Project

The La Fortuna Gold Project includes the historic La Fortuna mine together with the surrounding concessions, totaling 994 hectares. The property is located in the northwestern corner of the State of Durango, Mexico, about 70 kilometers northeast of the city of Culiacan, Sinaloa.

Initial development of La Fortuna followed the 1884 discovery of the gold-bearing oxidized outcrop. Between 1886 and 1892 a 200 TPD gravity mill was built near the site to process the ore which was selectively mined underground. Reportedly, about 200,000 tonnes of material, grading 20 g/t was mined and processed during this period. In 1987 an 80 tonne per day flotation mill was installed in order to process the sulfide ore, operating intermittently until 1990.





Between 1991 and 2008 numerous exploration surveys were performed which included detailed mapping and sampling of the underground workings and the drilling in the immediate La Fortuna Mine area. These programs culminated in the development of a resource block model which produced a Measured and Indicated resource of 4,800,000 tonnes at 2.0 g/t gold (308,000 contained ounces) at a 0.50 g/t gold cut-off grade as detailed below:

La Fortuna Resources:

Notes:

Pursuant to the terms of the binding LOI, the Company will pay the vendor USD $750,000 on closing. An additional USD $250,000 will be paid 9 months after the closing and USD $1,000,000 will be paid upon the announcement of a construction decision. The vendor is also entitled to a 2.5% net smelter returns royalty subject to a maximum amount of USD $4,500,000. The closing of the transaction is subject to regulatory approval.

About Minera Alamos

Minera Alamos is a junior exploration and development company. Its flagship project is the Los Verdes open pit copper-molybdenum project in Sonora, Mexico that is currently in development.

Mr. Darren Koningen, P. Eng., Minera Alamos Inc.'s President, is the Qualified Person responsible for technical content of this release under National Instrument 43-101. Mr. Koningen has supervised the preparation of, and approved the scientific and technical disclosures utilized in this news release.

Cautionary Note Regarding Forward-Looking Statements

This press release contains "forward looking statements" and "forward-looking information" under applicable Canadian securities laws. Forward-looking information includes, but is not limited to, information with respect to the proposed transaction, timing of the closing of proposed transaction and the Company's consideration of the proposed production plans. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "plans", "expects", "estimates", "intends", "anticipates" or "believes" or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might", or "will be taken", "occur", or "be achieved". Forward-looking information is based on the reasonable assumptions, estimates, analysis and opinions of management made at the date that such statements are made.

Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information, including the risk factors disclosed elsewhere in the Company's public disclosure. Accordingly, readers should not place undue reliance on forward-looking information. The forward-looking information contained herein is presented for the purposes of assisting readers in understanding the Company's plans and objectives and may not be appropriate for other purposes. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.



Contacts:
Minera Alamos Inc.
Chris Frostad
(416) 306-0990

Weitere Infos zu dieser Pressemeldung:

Themen in dieser Pressemitteilung:


Unternehmensinformation / Kurzprofil:
drucken  als PDF  an Freund senden  Tango Mining Limited Provides Further Status Report Franco-Nevada to Acquire a Precious Metals Stream from Glencore for US$500 Million
Bereitgestellt von Benutzer: Marketwired
Datum: 10.02.2016 - 17:21 Uhr
Sprache: Deutsch
News-ID 449946
Anzahl Zeichen: 0

contact information:
Town:

TORONTO, ONTARIO



Kategorie:

Mining & Metals



Diese Pressemitteilung wurde bisher 219 mal aufgerufen.


Die Pressemitteilung mit dem Titel:
"Minera Alamos Inc. Provides Plans Regarding La Fortuna Gold Project"
steht unter der journalistisch-redaktionellen Verantwortung von

Minera Alamos Inc. (Nachricht senden)

Beachten Sie bitte die weiteren Informationen zum Haftungsauschluß (gemäß TMG - TeleMedianGesetz) und dem Datenschutz (gemäß der DSGVO).


Alle Meldungen von Minera Alamos Inc.



 

Werbung



Facebook

Sponsoren

foodir.org The food directory für Deutschland
Informationen für Feinsnacker finden Sie hier.

Firmenverzeichniss

Firmen die firmenpresse für ihre Pressearbeit erfolgreich nutzen
1 2 3 4 5 6 7 8 9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z