CNRL Primrose Incident Caused by Excessive Steaming; AER Releases Final Investigation Report

CNRL Primrose Incident Caused by Excessive Steaming; AER Releases Final Investigation Report

ID: 458934

(firmenpresse) - CALGARY, ALBERTA -- (Marketwired) -- 03/21/16 -- Following a thorough investigation, the Alberta Energy Regulator (AER) is implementing additional requirements at Canadian Natural Resource Limited's (CNRL's) Primrose operations on the Cold Lake Air Weapons Range.

"This is one of the most complex investigations the AER has undertaken, and although we would normally just release the results on our

The new requirements are as a result of four flow-to-surface events, which started in May 2013 at CNRL's Primrose South and East locations, which resulted in the release of 1057 m3 of bitumen emulsion. CNRL also reported a flow-to-surface event in 2009.

In its investigation report, the AER concludes that the flow-to-surface events were caused by excessive steam volumes, along with open conduits such as well bores, natural fractures and faults, and hydraulically induced fractures.

The investigation report considered the information and findings provided by CNRL in its final report, as well as the results of an independent technical review panel. The report also describes all possible contributing factors, including the unique geology of the area, which may have contributed to the flow-to- surface events.

CNRL did not contravene any rules in their use of their specific steaming strategy, however the AER has since imposed regulatory requirements designed to prevent a further incident and permanently reduce steaming volumes. Should the company fail to meet these requirements, they could face enforcement action.

The Alberta Energy Regulator ensures the safe, efficient, orderly, and environmentally responsible development of hydrocarbon resources over their entire life cycle. This includes allocating and conserving water resources, managing public lands, and protecting the environment while providing economic benefits for all Albertans.

FOR BROADCAST USE:

The Alberta Energy Regulator has released its final investigation report in the 2013 CNRL incident that caused four flow-to-surface events near Cold Lake. The AER believes that the incidents were caused by excessive steaming by CNRL and, as a result, has put additional restrictions on operations in the area.





Backgrounder: Timeline of events

Backgrounder

Timeline





Contacts:
Bob Curran
AER Public Affairs
403-297-3392

Media line: 1-855-474-6356

Weitere Infos zu dieser Pressemeldung:

Themen in dieser Pressemitteilung:


Unternehmensinformation / Kurzprofil:
drucken  als PDF  an Freund senden  Industry Support for Eguana Technologies Molokai Pilot Project From Maui Energy Conference Cleantech Open Attends White House Water Summit and Launches Water-Technology Accelerator #WHWaterSummit
Bereitgestellt von Benutzer: Marketwired
Datum: 21.03.2016 - 18:00 Uhr
Sprache: Deutsch
News-ID 458934
Anzahl Zeichen: 0

contact information:
Town:

CALGARY, ALBERTA



Kategorie:

Alternative Energy



Diese Pressemitteilung wurde bisher 285 mal aufgerufen.


Die Pressemitteilung mit dem Titel:
"CNRL Primrose Incident Caused by Excessive Steaming; AER Releases Final Investigation Report"
steht unter der journalistisch-redaktionellen Verantwortung von

Alberta Energy Regulator (Nachricht senden)

Beachten Sie bitte die weiteren Informationen zum Haftungsauschluß (gemäß TMG - TeleMedianGesetz) und dem Datenschutz (gemäß der DSGVO).

AER issues penalty to Murphy Oil Limited for 2015 spill ...

CALGARY, ALBERTA -- (Marketwired) -- 02/28/17 -- The Alberta Energy Regulator (AER) has a $172 500 to Murphy Oil Company for a 2015 pipeline spill near Peace River.The spill, which went undetected from approximately January 15 to March 1, 2015, re ...

Alle Meldungen von Alberta Energy Regulator



 

Werbung



Facebook

Sponsoren

foodir.org The food directory für Deutschland
News zu Snacks finden Sie auf Snackeo.
Informationen für Feinsnacker finden Sie hier.

Firmenverzeichniss

Firmen die firmenpresse für ihre Pressearbeit erfolgreich nutzen
1 2 3 4 5 6 7 8 9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z