Cartier Launches 25,000-m Drill Program on the Chimo Mine Property

Cartier Launches 25,000-m Drill Program on the Chimo Mine Property

ID: 551835

(firmenpresse) - VAL-D'OR, QUEBEC -- (Marketwired) -- 07/11/17 -- Cartier Resources Inc. (TSX VENTURE: ECR) ("Cartier") is pleased to announce that it has launched a 25,000-m drill program on Chimo Mine property, located 45 km to the East of Val-d'Or. This program is designed to increase the size of the known gold zones and to highlight the potential for discovery of new gold zones.

The program consists of two phases: a first phase of 20,000 m, will explore the lateral and depth extensions (250 to 650 m) of 24 gold zones while a second phase of 5,000 m, will explore the deep extension of the main gold zone 5M of the old Chimo Mine (1,050 to 1,550 m). Historically, the Chimo Mine produced 379,012 ounces of gold (Source: MRNF, DV 85-05 to 97-01) of which 2/3 of the ounces were from the 5M zone. In total, 44 drill holes () will potentially cut up to 177 times the extension of the known gold zones and up to 281 times the structures that host the gold zones.

This program will require three drill rigs and pursue the fall 2016 program that totalled 2,517 m and which returned results including: 3.2 g/t Au over 15.0 m including 9.9 g/t Au over 4.0 m (CH16-06), 8.2 g/t Au over 7.0 m including 17.7g/t Au over 3.0 m (CH16-01), 88.6 g/t Au over 1.0 m and 11.8 g/t Au over 2.0 m (CH16-02).

"The Chimo Mine property straddles the prolific Larder Lake-Cadillac fault, a major regional structure that has produced over 100 million ounces of gold," commented Philippe Cloutier, President and CEO of Cartier.

Quality Assurance / Quality Control

The scientific and/or technical information presented in this press release has been reviewed and approved by Mr. Gaetan Lavalliere, P. Geo., Ph. D. and Vice President for Cartier Resources. Mr. Lavalliere is a qualified person as defined by National Instrument 43-101.

Neither the TSX Venture Exchange nor its regulatory services provider accepts responsibility for the adequacy or accuracy of this press release.







Contacts:
Philippe Cloutier, P.Geo.
President and CEO
819 856-0512



Investor Relations:
Relations Publiques Paradox
514 341-0408

Weitere Infos zu dieser Pressemeldung:

Themen in dieser Pressemitteilung:


Unternehmensinformation / Kurzprofil:
drucken  als PDF  an Freund senden  IDM Mining's Step-Out Drilling Intersects 14.00 meters True Width of 10.65 g/t Au and 17.37 g/t Ag at Red Mountain MacDonald Mines Reports Positive Metallurgical Results of the Oxide Sands at its Wawa-Holdsworth Project, Wawa, Ontario
Bereitgestellt von Benutzer: Marketwired
Datum: 11.07.2017 - 13:03 Uhr
Sprache: Deutsch
News-ID 551835
Anzahl Zeichen: 0

contact information:
Town:

VAL-D'OR, QUEBEC



Kategorie:

Mining & Metals



Diese Pressemitteilung wurde bisher 308 mal aufgerufen.


Die Pressemitteilung mit dem Titel:
"Cartier Launches 25,000-m Drill Program on the Chimo Mine Property"
steht unter der journalistisch-redaktionellen Verantwortung von

Cartier Resources Inc. (Nachricht senden)

Beachten Sie bitte die weiteren Informationen zum Haftungsauschluß (gemäß TMG - TeleMedianGesetz) und dem Datenschutz (gemäß der DSGVO).


Alle Meldungen von Cartier Resources Inc.



 

Werbung



Facebook

Sponsoren

foodir.org The food directory für Deutschland
Informationen für Feinsnacker finden Sie hier.

Firmenverzeichniss

Firmen die firmenpresse für ihre Pressearbeit erfolgreich nutzen
1 2 3 4 5 6 7 8 9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z