Paladin Energy Ltd-Kayelekera Mine, Malawi Drying and Packaging Plant Temporarily Off-Line

Paladin Energy Ltd-Kayelekera Mine, Malawi Drying and Packaging Plant Temporarily Off-Line

ID: 59668

(firmenpresse) - PERTH, WESTERN AUSTRALIA -- (Marketwire) -- 08/26/11 -- Paladin Energy Ltd. (TSX: PDN)(ASX: PDN) ("Paladin" or the "Company") advises that, in the course of the upgrade work currently being carried out during the planned maintenance shutdown at Kayelekera (as advised in the June quarter report), the drying and packaging plant (D&P plant) has been closely inspected for damage caused by localised movement related to previously advised land slippage. As a result, Paladin determined that in the interests of safety it would be prudent to bring forward its existing plans to relocate the D&P plant and this programme is now underway.

In the interim, Kayelekera will be producing yellowcake with higher moisture content than standard specification. Plans are in place to divert Kayelekera concentrates via its sister mine at Langer Heinrich in Namibia for final drying and packing en route to export from Walvis Bay in the normal manner. All Kayelekera concentrate is currently exported from Walvis Bay in Namibia and passes within 50km of Langer Heinrich and so can easily be diverted.

Paladin's risk mitigation plan has allowed for this contingency. The Langer Heinrich operation has sufficient reserve capacity in its D&P plant (in excess of the new Stage 3 design) to process the Kayelekera higher moisture concentrate until the D&P plant at Kayelekera in Malawi is re-commissioned.

The short-term changes to final drying and packaging of Kayelekera concentrate are not expected to impact Paladin's production guidance for FY2012 of 7.4Mlb to 7.9Mlb U3O8.

The project financiers and their technical advisors have been informed of the latest developments and the regulatory authorities are finalising procedures for these temporary arrangements, which will take place within the applicable regulatory framework for both mines.

We expect the Kayelekera operations to recommence production after the current scheduled shutdown, on Monday 29 August. In principle agreement has been reached with the lenders that regardless of the closure of the D&P plant, the Lenders Test can commence 1 September 2011.





ACN 061 681 098



Contacts:
In Australia:
Paladin Energy Ltd.
John Borshoff, Managing Director/CEO
+61 8 9381 4366
Mobile: +61 419 912 571


In Canada:
Paladin Energy Ltd.
Greg Taylor, Investor Relations Contact
+905 337-7673
Mobile: +416 605-5120 (Toronto)

Weitere Infos zu dieser Pressemeldung:

Themen in dieser Pressemitteilung:


Unternehmensinformation / Kurzprofil:
drucken  als PDF  an Freund senden  Therma-Med Inc. Announces New Information on Its Hindon Copper Property in Ontario, Canada Paladin Energy Ltd-Langer Heinrich Mine, Namibia Execution of US$141M Project Finance Facility for Stage 3 Expansion
Bereitgestellt von Benutzer: MARKET WIRE
Datum: 26.08.2011 - 13:08 Uhr
Sprache: Deutsch
News-ID 59668
Anzahl Zeichen: 0

contact information:
Town:

PERTH, WESTERN AUSTRALIA



Kategorie:

Mining & Metals



Diese Pressemitteilung wurde bisher 175 mal aufgerufen.


Die Pressemitteilung mit dem Titel:
"Paladin Energy Ltd-Kayelekera Mine, Malawi Drying and Packaging Plant Temporarily Off-Line"
steht unter der journalistisch-redaktionellen Verantwortung von

Paladin Energy Ltd (Nachricht senden)

Beachten Sie bitte die weiteren Informationen zum Haftungsauschluß (gemäß TMG - TeleMedianGesetz) und dem Datenschutz (gemäß der DSGVO).


Alle Meldungen von Paladin Energy Ltd



 

Werbung



Facebook

Sponsoren

foodir.org The food directory für Deutschland
Informationen für Feinsnacker finden Sie hier.

Firmenverzeichniss

Firmen die firmenpresse für ihre Pressearbeit erfolgreich nutzen
1 2 3 4 5 6 7 8 9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z