PRO-OR: Start Up Phase Underway at St-Augustin Pilot Plant

(firmenpresse) - MONTREAL, QUEBEC -- (Marketwire) -- 09/27/11 -- PRO-OR (TSX VENTURE: POI), announces the resumption of the long-awaited activities at its Pilot Plant in Quebec City's St-Augustin-de-Desmaures Industrial Park. Important improvements were introduced to Pro-Or's plant for the characterisation and complete optimisation of the industrial process leading to increased production scale and continuous industrial operations.
The main improvements were :
Pro-Or will soon hire a team of analysts and mass assessment experts who will supervise the characterisation tests and produce an official external report. Initially three series of tests are planned each made up of a normal operation phase during which samples will be taken at strategic points followed by a chemical analysis. These results will be compiled and result in recommendations of operational parameters. Adjustments to improve the efficiency of the process will be implemented. The assembly of the last plant components are scheduled to be completed by September 30 and followed by the start-up phase and the functionality certification. The supply of more than 650 catalytic converters to be used for characterisation and process optimization purposes is currently in our inventory.
Mr. Andre L'Heureux, P. Eng., head project engineer states "I am very confident in reaching our objectives and the follow-up realization of this extraordinary project".
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Contacts:
Ressources Minieres Pro-Or Inc.
Pierre Gevry, President
(514) 849-7336
(514) 849-9260 (FAX)
Themen in dieser Pressemitteilung:
Unternehmensinformation / Kurzprofil:
Bereitgestellt von Benutzer: MARKET WIRE
Datum: 27.09.2011 - 14:19 Uhr
Sprache: Deutsch
News-ID 70209
Anzahl Zeichen: 0
contact information:
Town:
MONTREAL, QUEBEC
Kategorie:
Mining & Metals
Diese Pressemitteilung wurde bisher 151 mal aufgerufen.
Die Pressemitteilung mit dem Titel:
"PRO-OR: Start Up Phase Underway at St-Augustin Pilot Plant"
steht unter der journalistisch-redaktionellen Verantwortung von
Ressources Minieres Pro-Or Inc. (Nachricht senden)
Beachten Sie bitte die weiteren Informationen zum Haftungsauschluß (gemäß TMG - TeleMedianGesetz) und dem Datenschutz (gemäß der DSGVO).