Hard Creek Nickel Corporation: Updated Preliminary Economic Assessment Models Production of Saleable

Hard Creek Nickel Corporation: Updated Preliminary Economic Assessment Models Production of Saleable Concentrate

ID: 78631

2.18 billion lb. of nickel and 123 million lb. of cobalt recovered to high quality 18% nickel concentrate 16.0% pretax IRR, 13.6% after tax IRR at $8.50/lb. nickel At 8% discount rate, US $1,292 million pretax NPV, US $725 million after tax NPV

(firmenpresse) - VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 10/20/11 -- Hard Creek Nickel Corporation (TSX: HNC) is pleased to release the results of a new Preliminary Economic Assessment (PEA) of its wholly owned Turnagain Nickel Project in Northwestern British Columbia. In a fundamental shift from the previous PEA released in 2010, the project will now produce nickel concentrate for sale rather than building a complex on-site refinery.

The study, authored by AMC Mining Consultants (Canada) Ltd., recommends the project be built as an open pit mine and mill processing 43,200 tonnes per day (tpd) for the first five years producing 52.72 million pounds (23,912 tonnes) of nickel and 2.82 million pounds (1,280 tonnes) of cobalt in concentrate annually. This is followed by an expansion to 86,000 tpd for the next sixteen years producing 97.87 million pounds (44,394 tonnes) of nickel and 5.36 million pounds (2,433 tonnes) of cobalt in concentrate annually.

A focused metallurgical program, initiated in 2010, dramatically improved the metallurgy of the project resulting in the ability to produce a saleable 18% nickel concentrate using a simple flow sheet and readily available reagents. This allows the project to move forward without the higher technical risk and larger capital previously required for the construction of a refinery at site. The recent approval of the construction of the Northwest BC power transmission line from Terrace to Bob Quinn has facilitated the supply of reliable and competitively priced electrical power for the Turnagain Project.

"Our updated study represents a major milestone for the Turnagain Project," said Mark Jarvis, CEO of Hard Creek Nickel. "We now have a long life project that is able to produce a very desirable, clean concentrate product that the world's nickel smelters need. This will be an open pit mine using SAG mills, ball mills and standard flotation tanks, so technical risk has been reduced dramatically. Coupled with that is a reduction in initial capital required, from $2.9 billion to $1.3 billion. This makes our financial metrics competitive with every other large greenfield nickel project in the world."





KEY DATA

This PEA includes the use of inferred mineral resources that are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves. The study is preliminary in nature and there is no assurance the mining, metal production, or cash flow scenarios outlined in this report would ever be realized. Mineral resources are not mineral reserves and do not have demonstrated economic viability.

FINANCIAL VALUATION

The PEA indicates the economic returns from the project justify further development of the Turnagain project and recommendations have been made to HNC to proceed to pre-feasibility level.

The financial results of the assessment ("Base Case") were developed using commodity prices of US $8.50/lb. of nickel and US $14.00/lb. of cobalt, an exchange rate of 0.95 US$/CAN$ and a discount rate of 8.0%. The nickel price was considered reasonable given the spot price of nickel on October 14, 2011 was US $8.63/lb., the LME three-year historical rolling average prices as of the end of September 2011 is US $8.70/lb., and our metal market analyst projects a long term price of US $9.50/lb.

The Base Case with +/- nickel price scenario is presented as follows:

CAPITAL AND OPERATING COSTS

The total initial capital investment in the project is estimated to be US $1.32 billion, which represents the total direct and indirect costs, including associated infrastructure, power transmission line, and contingencies. The Base Case presented in the PEA is designed for increased production in year six which requires expansion in year five. The following table shows the initial and expansion capital distributed between the various project components.

The mine site operating costs are presented below for the initial five years, after expansion (from Year 6 to 21) and the life of mine ("LOM") as US$/tonne ore.

MINERAL RESOURCES

The total estimated resource for the Turnagain Project, at a 0.1% Ni cut-off, is as follows:

The plan provided in the PEA limits the pit mining to 21 years with milling of the stockpiles for several additional years for a total mine life of 27.2 years. The PEA base case in-pit mined resource consist of 206 million tonnes of measured resource at 0.231% Ni, 0.014% Co, 356 million tonnes of indicated resource at 0.226% Ni, 0.013% Co,and 201 million tonnes of inferred resource at 0.235% Ni, 0.013% Co.

Additional in-pit resource potential exists beyond the PEA base case limits consisting of 21 million tonnes of measured resource at 0.196% Ni and 0.012% Co, 117 million tonnes of indicated resource at 0.195% Ni and 0.012% Co and 361 million tonnes of inferred resource at 0.214% Ni and 0.012% Co.

DEVELOPMENT PLAN

The PEA evaluates the development of the Turnagain deposit by conventional open-pit methods with trucks and shovels. The deposit will be mined in phases. An elevated cut-off Net Smelter Return ("NSR") will be employed in the initial production years to enhance the economics of the project. Low NSR grade material below the initial cut-off will be sent to low grade stockpiles and later blended with "run of mine" feed or processed near the end of mine life. Ore will be processed using a conventional concentrator to produce nickel-cobalt concentrate.

Key metrics for mining and processing are shown below:

OPPORTUNITIES

The economics of the PEA do not take into account opportunities for future improvement based on:

Varying the mill throughput. Two scenarios were reviewed in addition to the Base Case presented. They include Scenario 1 with no increased throughput in Year 6 and Scenario 2 starting with increased throughput in Year 1. The comparisons of the scenarios with the Base Case is shown in the table below.

FINANCIAL COMPARISON OF SCENARIOS

CONFERENCE CALL

Hard Creek Nickel Corporation will hold a conference call on Monday, October 24, 2011 at 10 a.m. Pacific Standard Time (1 PM Eastern Time) to discuss the Updated Preliminary Economic Assessment. To access the conference call, please dial:

North America Toll Free: 1 866 223 7781

International: 1 416 340 8018

You may also access a live webcast of the conference call via Hard Creek Nickel's website at . The event will be archived and available for replay through October 24, 2012.

TECHNICAL REPORT

The technical report will be prepared by AMC Mining Consultants (Canada) Ltd. and its associate companies AMC Consultants Pty Ltd. and AMC Consultants UK Ltd. (collectively "AMC). AMC provides a broad range of mine engineering, geotechnical, geological and corporate consulting services to exploration, mining and financial services worldwide. AMC's scoping, pre-feasibility and feasibility studies have embraced large and small projects, both surface and underground and covering a wide range of minerals and commodities.

The technical report of the PEA will be posted on the Company's website () as well as Sedar and Edgar within 45 days.

Qualified Persons

The qualified persons responsible for the preparation of the final PEA document will be:

This press release uses the terms "measured" "indicated" and "inferred" resources. We advise U.S. investors that while those terms are recognized and required by Canadian regulations, the U.S. Securities and Exchange Commission does not recognize them. U.S. investors are cautioned not to assume that any part or all of mineral deposits in these categories would ever be converted to reserves.

This press release contains "forward looking statements". Such forward-looking statements involve a number of known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the company's plans to materially differ from any future results, performance or achievements expressed or implied by such forward-looking statements. Known risks include, but are not limited to, financing risks, commodity price risks, scheduling risks and engineering risks. Readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date the statements were made, and readers are advised to consider such forward-looking statements in light of the risks set forth in the company's continuous disclosure filings as found at .

This news release has been reviewed and approved by Neil Froc, P. Eng, a Qualified Person consistent with NI 43-101.

MARK JARVIS, President

HARD CREEK NICKEL CORPORATION

The Toronto Stock Exchange does not accept responsibility for the accuracy or adequacy of this news release.



Contacts:
Hard Creek Nickel Corporation
Mark Jarvis
President
604-681-2300
604-681-2310 (FAX)


Themen in dieser Pressemitteilung:


Unternehmensinformation / Kurzprofil:
drucken  als PDF  an Freund senden  Romex Mining Corporation: Introduction and Operational Update Stillwater Mining Company Reports Occurrences of Smoke in Its Stillwater Mine
Bereitgestellt von Benutzer: MARKET WIRE
Datum: 20.10.2011 - 17:20 Uhr
Sprache: Deutsch
News-ID 78631
Anzahl Zeichen: 0

contact information:
Town:

VANCOUVER, BRITISH COLUMBIA



Kategorie:

Mining & Metals



Diese Pressemitteilung wurde bisher 146 mal aufgerufen.


Die Pressemitteilung mit dem Titel:
"Hard Creek Nickel Corporation: Updated Preliminary Economic Assessment Models Production of Saleable Concentrate"
steht unter der journalistisch-redaktionellen Verantwortung von

Hard Creek Nickel Corporation (Nachricht senden)

Beachten Sie bitte die weiteren Informationen zum Haftungsauschluß (gemäß TMG - TeleMedianGesetz) und dem Datenschutz (gemäß der DSGVO).

Hard Creek Nickel Accelerated Warrant Exercise Clause ...

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 03/02/17 -- Hard Creek Nickel Corp. (TSX VENTURE: HNC) ("the Company") announced today that the Company's shares have traded at more than $0.065 per share for 10 consecutive trading day ...

Hard Creek participates in Carbon Sequestration study ...

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 02/27/17 -- Mark Jarvis, CEO of Hard Creek Nickel Corp. (TSX VENTURE: HNC), announced today that the University of British Columbia has been approved for a $25,000 Natural Science and Engineering Rese ...

Hard Creek Engages German Mining Networks ...

VANCOUVER, BRITISH COLUMBIA -- (Marketwired) -- 10/25/16 -- Hard Creek Nickel Corp. (TSX VENTURE: HNC) has engaged the services of German Mining Networks, based in Frankfurt, Germany. German Mining Networks will work to increase investor awareness ...

Alle Meldungen von Hard Creek Nickel Corporation



 

Werbung



Facebook

Sponsoren

foodir.org The food directory für Deutschland
Informationen für Feinsnacker finden Sie hier.

Firmenverzeichniss

Firmen die firmenpresse für ihre Pressearbeit erfolgreich nutzen
1 2 3 4 5 6 7 8 9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z