Dunav Resources Confirms Continuity of Copper-Gold Mineralization Between the Kiseljak North and Kis

Dunav Resources Confirms Continuity of Copper-Gold Mineralization Between the Kiseljak North and Kiseljak South Zones, Tulare Porphyry Project, Serbia

ID: 87974

(firmenpresse) - LONGUEUIL, QUEBEC -- (Marketwire) -- 11/15/11 -- Dunav Resources Ltd. (TSX VENTURE: DNV) (the "Company" or "Dunav") is pleased to present an update on drill results from the Kiseljak copper-gold diorite porphyry, part of the Tulare Porphyry Project located within the Tertiary magmatic arc of the Western Tethyan in Southern Serbia.

The majority of soil samples have been assayed at the ALS Chemex laboratory, Perth, Australia. More recent soil sampling programs have been assayed at the SGS managed laboratory at Chelopech in Bulgaria using a combination of ICP-OES and ICP-MS, whereas gold has been assayed by low level detection fire assay method (50 gram sample charge) with an AAS finish. Trench samples were prepared at the laboratory facility at SGS Bor and the samples have been assayed at the SGS managed laboratory at Chelopech in Bulgaria or the SGS managed laboratory facility at Bor. Diamond drill core has been prepared at the laboratory facility at Bor and assayed at either the SGS managed laboratory at Chelopech in Bulgaria or the SGS managed laboratory at Bor. Trench and diamond drill samples have been assayed for gold by 50 gram fire assay with an AAS finish whilst copper, silver and molybdenum have been analysed using an aqua regia digest with an AAS finish. A one metre sampling interval has been used where possible for the Tulare Porphyry Project diamond drilling program. Half core is routinely submitted to the laboratory for analysis. Following Dunav standard quality assurance procedures, a full suite of field and laboratory duplicates and replicates along with internationally accredited standards and blanks, have been submitted with each batch of samples.

Trench sampling was carried out as channels in the wall just above the trench floor on 2 meter intervals. Except where extensive soil cover is encountered, trenches were sampled in their entirety. The samples were routinely weighed prior to final bagging to maintain an even sample size and to avoid sampling bias in harder rock types. An average channel sample weight was maintained at 3 kilograms per meter, which produces a consistent sample weight approximating half HQ core samples. Field duplicate samples were taken every 20 samples and known standards were inserted into the sample stream after every 20th sample. A geological and structural log was completed as for diamond drilling. All data collected in the field was routinely entered into geology and structural geology spread sheets using Field Marshal software for subsequent entry to an acQuire database and validation.





Dr Julian F. H. Barnes, a qualified person under National Instrument 43-101, the Company's Special Consultant, has supervised the preparation of the technical data in this press release.

Previously released data refers to data included in the "Tulare Project, Serbia National Instrument 43-101 Technical Report" by Paul Mazzoni dated November 22, 2010 (the "Technical Report"), filed on SEDAR at . Further information in respect of results, investigations, interpretations, quality assurance and quality control measures, along with geology, mineralogy, sampling, and analytical procedures is included in the Technical Report.

About Dunav Resources Ltd.: Dunav Resources is a mineral exploration company focussed on the acquisition, exploration and development of mineral properties in Serbia. Additional information about the Company is available on SEDAR at and at .

Dunav is well-capitalized, with approximately $10.0 million in its treasury at October 31, 2011, which it plans to use for the exploration and development of its mineral projects in Serbia. Dunav's issued and outstanding share capital totals 99,017,749 common shares, of which approximately 47.5% is held by Dundee Precious Metals Inc.

Cautionary Statement

This press release contains forward-looking information. In particular, this press release contains statements concerning exploration results and geological interpretation, planned exploration programs, and the potential of the Tulare Project. Although the Company believes in light of the experience of its officers and directors, current conditions and expected future developments and other factors that have been considered appropriate that the expectations reflected in this forward-looking information are reasonable, undue reliance should not be placed on them because the Company can give no assurance that they will prove to be correct. Forward-looking information is subject to known and unknown risks and uncertainties, and depends on assumptions and other factors, all of which may cause actual results or events to differ materially from those anticipated in such forward-looking information. The forward-looking statements contained in this press release are made as of the date hereof and the Company undertakes no obligations to update publicly or revise any forward-looking statements or information, whether as a result of new information, future events or otherwise, unless so required by applicable securities laws.

Additional maps and tables are available at the following address:

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.



Contacts:
Dunav Resources Ltd.
James Crombie
President and Chief Executive Officer
450-640-0810

Weitere Infos zu dieser Pressemeldung:

Themen in dieser Pressemitteilung:


Unternehmensinformation / Kurzprofil:
drucken  als PDF  an Freund senden  Midland Identifies Several New Gold Targets on its Casault Property Following a VTEM Survey Lone Star Gold, Inc. Provides Due Diligence Results Update on Mexico-Based Ocampo Property
Bereitgestellt von Benutzer: MARKET WIRE
Datum: 15.11.2011 - 13:45 Uhr
Sprache: Deutsch
News-ID 87974
Anzahl Zeichen: 0

contact information:
Town:

LONGUEUIL, QUEBEC



Kategorie:

Mining & Metals



Diese Pressemitteilung wurde bisher 171 mal aufgerufen.


Die Pressemitteilung mit dem Titel:
"Dunav Resources Confirms Continuity of Copper-Gold Mineralization Between the Kiseljak North and Kiseljak South Zones, Tulare Porphyry Project, Serbia"
steht unter der journalistisch-redaktionellen Verantwortung von

Dunav Resources Ltd. (Nachricht senden)

Beachten Sie bitte die weiteren Informationen zum Haftungsauschluß (gemäß TMG - TeleMedianGesetz) und dem Datenschutz (gemäß der DSGVO).


Alle Meldungen von Dunav Resources Ltd.



 

Werbung



Facebook

Sponsoren

foodir.org The food directory für Deutschland
Informationen für Feinsnacker finden Sie hier.

Firmenverzeichniss

Firmen die firmenpresse für ihre Pressearbeit erfolgreich nutzen
1 2 3 4 5 6 7 8 9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z