Dannemoras Mineral Reserve updated

Dannemoras Mineral Reserve updated

ID: 103482

(Thomson Reuters ONE) -




An update of the Dannemora Mineral Reserve was concluded December 23. 2011. The
new estimate of the Mineral Reserve shows an increase with 6.9 million tonnes to
a total of 35.1 million tonnes, while the iron content in the crude ore has
decreased with 0.94 percent. The entire Mineral Reserve is classified as
probable.

The basis for this estimate is the updated Mineral Resource which was reported
in August 2011 and includes the recently core drilled mineralization Norrnäs 3
and a change of the cut-off grade to 20 percent iron. The former estimate was
based on a cut-off grade of 30 percent iron.

The lower cut-off grade affects the amount of waste rock and consequently the
iron content.

The reported tonnage and waste rock dilution are a function of the chosen mining
method, sublevel caving. The wallrock in Dannemora is generally very stable. In
the estimated mineral reserve it is assumed that, in most cases, one meter of
wallrock will dilute the ore. This wallrock is assumed to contain five percent
iron.
The reported Mineral Reserve includes 14 different mineralizations distributed
along the total length of the ore field, 3 kilometers. In order to achieve an
even quality of products, the feed of crude ore into the sorting plant must be
blended from different ore bodies. The crude ore will be treated in a dry
magnetic process (under construction) that is designed to produce 60 % lump ore
and 40 % fines. The lump ore will contain 50 percent iron and the fines 55
percent iron.

Read full ress Release below



Press Release 12 januari 2012:
http://hugin.info/137553/R/1577025/491586.pdf




This announcement is distributed by Thomson Reuters on behalf of
Thomson Reuters clients. The owner of this announcement warrants that:
(i) the releases contained herein are protected by copyright and




other applicable laws; and
(ii) they are solely responsible for the content, accuracy and
originality of the information contained therein.

Source: Dannemora Mineral AB via Thomson Reuters ONE

[HUG#1577025]


Unternehmensinformation / Kurzprofil:
drucken  als PDF  an Freund senden  Norske Skog and NTE enter into long-term energy contract Operational update for Q4 2011
Bereitgestellt von Benutzer: hugin
Datum: 12.01.2012 - 09:18 Uhr
Sprache: Deutsch
News-ID 103482
Anzahl Zeichen: 2376

contact information:
Town:

Österbybruk



Kategorie:

Business News



Diese Pressemitteilung wurde bisher 242 mal aufgerufen.


Die Pressemitteilung mit dem Titel:
"Dannemoras Mineral Reserve updated"
steht unter der journalistisch-redaktionellen Verantwortung von

Dannemora Mineral AB (Nachricht senden)

Beachten Sie bitte die weiteren Informationen zum Haftungsauschluß (gemäß TMG - TeleMedianGesetz) und dem Datenschutz (gemäß der DSGVO).

Dannemora Mineral AB: Press Release 13 November 2009 ...

AGREEMENT SIGNED WITH VOESTALPINE FOR TRIAL DELIVERY OF IRON ORE Dannemora has signed an agreement with Austrian steel company Voestalpine AG for the delivery of approx. 10,000 tonnes of iron ore products. The ore will be shipped from the port of Ha ...

Dannemora Mineral AB: Interim Report January - June 2009 ...

* With global demand for steel having stabilised in the second quarter, many steel companies entered the third quarter in a position to raise their prices. * Iron ore imports to China hit a record high in the first half of 2009, increa ...

Alle Meldungen von Dannemora Mineral AB



 

Werbung



Sponsoren

foodir.org The food directory für Deutschland
News zu Snacks finden Sie auf Snackeo.
Informationen für Feinsnacker finden Sie hier.

Firmenverzeichniss

Firmen die firmenpresse für ihre Pressearbeit erfolgreich nutzen
1 2 3 4 5 6 7 8 9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z