Tigray Drills 31.75 Metres of 1.84% Copper, 0.83 Grams per Tonne Gold, 17 Grams per Tonne Silver and 7.03% Zinc at Terakimti Prospect, Harvest Project, Ethiopia

(firmenpresse) - VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 04/02/12 -- Tigray Resources Inc. (TSX VENTURE: TIG) ("Tigray" or the "Company") reports new diamond drill results at the Terakimti volcanogenic massive sulfide (VMS) copper-gold discovery on the Company's Harvest project in northern Ethiopia. Four separate VMS lenses have been discovered at Terakimti over a strike length of 800 metres. Recent drilling has extended mineralization along strike and down dip, with the system remaining open in these directions.
Highlights
Important New Drill Intercepts
These new results, along with petrological studies and a detailed interpretation of Terakimti, have provided a better understanding of the mineralizing system.
Planned Phase 2 drilling will test the down dip extensions of the system, with 7,500 metres of drilling to depths of up to 500 metres. A helicopter VTEM (electromagnetic, magnetic and radiometric) survey will be completed to test 15 kilometres along strike of Terakimti, and the more recent Mayshehagne discovery, in order to expedite regional targeting along these two trends.
Geological Interpretation
The Terakimti VMS discovery is hosted within a sequence of intermediate volcanic rocks with basalt in the hanging wall. Exhalative siliceous banded iron formation occurs at the periphery of the mineralized zone, with jasperoidal alteration of basalts common in the immediate hanging wall. Numerous quartz-eye porphyry dykes intrude the centre of the mineralized system and may be responsible for partial upgrading of mineralization through recrystallization. All mineralized lenses and associated alteration have a moderate east-northeast plunge and remain open down plunge.
The system currently consists of four stacked lenses containing copper-gold-silver and variable zinc:
Numerous targets in the area remain to be tested, including a gravity-resistivity target on the northern strike extension of the system, the down-plunge extensions of all lenses, and the northern copper-lead anomaly located 500 metres north of the Terakimti VMS discovery.
Click here for a plan view map and long sections: . A complete list of drill hole intercepts can be found on the Company's website at .
Quality Control
The planning, execution and monitoring of Tigray's quality control programs at the Harvest project are under the supervision of Jeff Heidema, P.Geo., Tigray's Vice President Exploration. Mr. Heidema is a Qualified Person as defined by National Instrument 43-101.
Diamond drill core samples have undergone preliminary preparation at the Acme Laboratories facility in Ankara, Turkey, and are crushed to 80% passing 10 mesh, and pulverized to 85% passing 200 mesh (Acme R200-1000 package). Analyses are conducted at Acme Laboratories in Vancouver, Canada, utilizing Aqua Regia digestion and ICP-ES. Precious metal analyses are conducted via Fire Assay Fusion with AAS finish, and gravimetric analyses for over-limit samples. Blanks and certified reference standards are inserted into the sample stream to monitor laboratory performance.
About Tigray
Tigray is a Canadian mineral exploration company focused on discovery through advancing early-stage mineral projects in Ethiopia. Tigray's key property is the 70%-owned Harvest polymetallic VMS exploration project, which covers 362 square kilometres in the Tigray region of Ethiopia, 600 kilometres north-northwest of the capital city of Addis Ababa. The Company recently entered into an agreement to acquire the Harvest North properties, which cover 795 square kilometres immediately west of the Harvest project. The Company's shares trade on the TSX Venture Exchange under the symbol TIG.
On behalf of the Board of Directors:
Andrew Lee Smith, P.Geo., President, CEO and Director
Cautionary Statement Regarding Forward-Looking Information
This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "anticipate", "believe", "plan", "expect", "intend", "estimate", "forecast", "project", "budget", "schedule", "may", "will", "could", "might", "should" or variations of such words or similar words or expressions. Forward-looking information is based on reasonable assumptions that have been made by the Company as at the date of such information and is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information, including but not limited to: risks associated with mineral exploration and development; metal and mineral prices; availability of capital; accuracy of the Company's projections and estimates; interest and exchange rates; competition; stock price fluctuations; availability of drilling equipment and access; actual results of current exploration activities; government regulation; political or economic developments; environmental risks; insurance risks; capital expenditures; operating or technical difficulties in connection with development activities; personnel relations; the speculative nature of strategic metal exploration and development including the risks of diminishing quantities of grades of reserves; contests over title to properties; and changes in project parameters as plans continue to be refined, as well as those risk factors set out in the Company's listing application dated August 18, 2011.
Forward-looking statements are based on assumptions management believes to be reasonable, including but not limited to the price of gold; the demand for gold; the ability to carry on exploration and development activities; the timely receipt of any required approvals; the ability to obtain qualified personnel, equipment and services in a timely and cost-efficient manner; the ability to operate in a safe, efficient and effective manner; and the regulatory framework regarding environmental matters, and such other assumptions and factors as set out herein. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. The Company does not undertake to update any forward-looking information that is included herein, except in accordance with applicable securities laws.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.
Contacts:
Tigray Resources Inc.
Meghan Brown
Director Investor Relations
604-488-2557
Themen in dieser Pressemitteilung:
Unternehmensinformation / Kurzprofil:
Bereitgestellt von Benutzer: MARKETWIRE
Datum: 02.04.2012 - 10:00 Uhr
Sprache: Deutsch
News-ID 130754
Anzahl Zeichen: 0
contact information:
Town:
VANCOUVER, BRITISH COLUMBIA
Kategorie:
Mining & Metals
Diese Pressemitteilung wurde bisher 286 mal aufgerufen.
Die Pressemitteilung mit dem Titel:
"Tigray Drills 31.75 Metres of 1.84% Copper, 0.83 Grams per Tonne Gold, 17 Grams per Tonne Silver and 7.03% Zinc at Terakimti Prospect, Harvest Project, Ethiopia"
steht unter der journalistisch-redaktionellen Verantwortung von
Tigray Resources Inc. (Nachricht senden)
Beachten Sie bitte die weiteren Informationen zum Haftungsauschluß (gemäß TMG - TeleMedianGesetz) und dem Datenschutz (gemäß der DSGVO).