Sunridge Gold Announces Positive Feasibility Study for the Debarwa Deposit, Asmara Project, Eritrea

Sunridge Gold Announces Positive Feasibility Study for the Debarwa Deposit, Asmara Project, Eritrea

ID: 145868

(firmenpresse) - VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 05/14/12 -- Sunridge Gold Corp. (TSX VENTURE: SGC)(OTCQX: SGCNF) is pleased to announce the completion and positive results of an independent feasibility study (the "Study") by lead engineer SENET (Pty) Ltd. ("SENET") for its 100% owned Debarwa volcanogenic-massive-sulphide (VMS) copper-gold-zinc deposit, part of the Asmara Project, Eritrea. The Study has concluded that operating Debarwa as a stand-alone mining operation is economically viable. The recently commenced feasibility study on the Asmara North deposits will also examine the integration of the Debarwa deposit with the Asmara North deposits into one operation.

On May 2, 2012, Sunridge announced the positive results of a pre-feasibility study on the Asmara North deposits which integrated the Debarwa deposit into a single mining and processing operation. The pre-feasibility study considered the trucking of ore from the Debarwa deposit approximately 40 kilometers south of Emba Derho to a centralized operating facility located near the Emba Derho deposit. The pre-feasibility study showed very robust economics with a Net Present Value of $555 million using a 10% discount rate. This Debarwa feasibility study, in contrast, considers the technical and economic viability of operating Debarwa as a stand-alone operation with its own processing plant and ancillary facilities. Based on the results of the feasibility study now underway (known as the "Asmara Project Feasibility Study") Sunridge will make the decision as to whether Debarwa would be best be operated as a stand-alone mine or as ore feed to the proposed central milling facilities near Emba Derho.

Debarwa Feasibility Study Base Case Highlights:

Michael Hopley, President and CEO of Sunridge Gold, states, "The completion of the Debarwa feasibility study demonstrates that the Debarwa deposit can be operated as an economically viable stand-alone open-pit mine. The choice to advance Debarwa separately from the northern deposits provides Sunridge the opportunity for earlier production and cash-flow from the high-grade copper ore at Debarwa. Management will review all options upon completion of the Asmara Project Feasibility Study which is being conducted concurrently with the application for permitting and a mining license at Debarwa."





Mining

Based on a series of trade-off studies the Study has concluded that Debarwa is best mined by open-pit methods up to a maximum rate of 7.5 million tonnes of rock (ore and waste) per annum of open pit mining. The open pit is estimated to contain 1.3 million tonnes of ore and 18 million tonnes of waste rock at an overall strip ratio of 14.3:1 waste tonnes to ore tonnes.

Open pit mining of pre-strip waste rock and stockpiling of Oxide and Transitional gold bearing ores commences 15 months prior to Phase I process plant production start-up and the costs of pre-stripping are included in the capital costs. Mining is completed at the end of year 3 of the process schedule.

Production

Mining and production (processing) at Debarwa takes place over 4.7 years and is divided into 2 phases as follows:

Phase I production has direct shipping ore (DSO) and Supergene ore mined and processed concurrently followed by Primary ore. DSO is a high grade zone of the supergene ore, averaging 16% copper. The DSO is crushed to minus three quarter inch (-20mm) and directly shipped to a smelter. Supergene and Primary ores are processed using conventional flotation to produce a copper concentrate with gold and silver credits. No zinc is recovered in the process as the zinc resources currently do not warrant a zinc recovery plant. Phase I processing will utilize the same crushing and ball milling circuit which includes primary and secondary crushing followed by ball milling.

Phase II processing of stockpiled Oxide and Transitional ores uses the same crushing and milling circuit followed by carbon-in-leach (CIL) processing to produce a gold and silver dore for shipping to a refinery.

Management estimates that initial production and shipping of DSO ore at Debarwa could commence in the fourth quarter of 2014. This allows time for completion of the required environmental work, publication of the Social and Environmental Impact Assessment (SEIA), permitting, financing, waste rock pre-stripping and construction.

Debarwa Phase I - DSO, Supergene and Primary Copper Ore (Year 1 - Year 3.3)

Debarwa Phase II - Oxide and Transition Gold and Silver Ores (Year 3.3 to 4.7)

Table 1 is a summary of the Production Schedule for Phase I and Phase II.

Financial Analysis (all $ equals US dollars)

The base case uses constant metal prices of $3.28/lb copper, $1,111/oz gold and $21.00/oz silver, which are derived from the 5 year average prices as of April 25, 2012.

Operating Costs

On site operating costs average $73.09 per tonne through life of mine.

Capital Costs

Initial capital costs are projected at $140.5 million (including pre-strip mining of $27.3 million, owner's costs of $15.1 million and a contingency of $7.8 million). The expansion capital for Phase II (gold CIL plant) is an additional $18.8 million, this is included as part of sustaining capital requirements.

Closure costs are estimated at an additional $16.5 million.

Project Ownership

The study was completed on a 100% project basis, however when the mining license for Debarwa is granted the Government of Eritrea will have a right to a 10% carried interest in the project and the additional option to purchase up to a 30% working interest. It is not known at this time what level of interest the government intends to acquire in Debarwa.

Mineral Reserves

The Study used the recently completed estimate of Measured and Indicated Resources for the Debarwa deposit as reported in the Company's press release dated August 18, 2011 (see news release for additional details).

Tables 5 and 6 below summarize the Mineral Reserves included in the Study broken down by both ore type and classification.

Note: The Study does not plan for zinc being processed and recovered at Debarwa and therefore zinc values are not included in the above Reserve tabulations. However, there is a zinc resource in the primary zone of 832,000 tonnes in the Measured and Indicated category with an average grade of 3.86% zinc.

The mineral reserves listed in Table 5 and 6 were estimated for the Debarwa deposit by generating Net Smelter Return (NSR) values (revenue minus transport, royalty and smelting/selling costs) for each metal using Measured and Indicated Resources only. Metal prices used to generate the mineral reserves were $2.85/lb copper, $1,150/oz gold and $18.50/oz silver. The net revenue of each block was compared to total cost. Each mining block becomes economical and included in the processing schedule if it is above the total cost of processing, general administrative and applicable transport.

Social and Environmental Studies

Social and environmental baseline studies and stakeholder engagement programs are well advanced for the Debarwa deposit. This work has been completed to comply with the Equator Principles and the International Finance Corporation Performance Standards for Social and Environmental Impact Assessment ("SEIA") Studies, as well as the Eritrean Government "National Environmental Assessment Procedures & Guidelines". The work is being carried out by the Sunridge social and environmental staff and consultants (both international and national) and it is anticipated that this will lead to the publication of an SEIA in June 2012.

Project Location and Access

The Debarwa deposit is located within a 30 minute drive on paved roads south of the capital city of Asmara with close proximity to a labour force, power, water and an international airport. In addition, the Red Sea port city of Massawa is 120 kilometers east of Asmara via paved road.

Project Opportunities

Opportunities to further enhance the economic value of the Debarwa deposit will be investigated before start of production. The following opportunities could significantly enhance the value of the project:

The Feasibility Study Report

The Debarwa Feasibility Study is NI 43-101 compliant and was completed by SENET (Pty) Ltd. and AMC Consultants Pty Ltd. ("AMC") with work by Knight Piesold Ltd. for tailings facility design and waste management and Blue Coast Metallurgy for metallurgical work. The report will be filed on the Company's profile on within 45 days of the date of this press release.

Qualified Person

The Debarwa Feasibility study results were reviewed by SENET under the direction of Joint Managing Director, Neil Senior an Independent Qualified Person. The scientific and technical information in this release has been reviewed and approved by David Lee F.AusIMM of AMC, and Ken Brouwer, P.Eng., of Knight Piesold Ltd., both of whom are Independent Qualified Persons within the meaning of NI 43-101.

Michael Hopley, President and CEO of Sunridge Gold Corp., is the Company's Qualified Person responsible for the contents of this press release and has reviewed the information in the release and confirmed that it is consistent with that provided by the independent Qualified Person responsible for the Study.

To view the image accompanying this press release, please click on the following link:

About Sunridge:

Sunridge is a mineral exploration and development company focused on the acquisition, exploration, discovery and development of base and precious metal deposits on the Asmara Project in Eritrea and exploration properties in Madagascar. Sunridge currently has approximately 117 million shares outstanding and trades on the TSX Venture Exchange under the symbol SGC. For additional information on the Company and its projects please view the slide show on our website at or call Greg Davis at the numbers listed below.

SUNRIDGE GOLD CORP.

Michael Hopley, President and Chief Executive Officer

This news release contains forward-looking statements that are based on the Company's current expectations and estimates. Forward-looking statements are frequently characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate", "suggest", "indicate" and other similar words or statements that certain events or conditions "may" or "will" occur. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forward-looking statements. Such factors include, among others: the actual results of current exploration activities; conclusions of economic evaluations; changes in project parameters as plans to continue to be refined; possible variations in ore grade or recovery rates; accidents, labor disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing; and fluctuations in metal prices. There may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.



Contacts:
Sunridge Gold Corp.
Greg Davis
VP Business Development
604-688-1263 (direct)

Weitere Infos zu dieser Pressemeldung:

Themen in dieser Pressemitteilung:


Unternehmensinformation / Kurzprofil:
drucken  als PDF  an Freund senden  Bellhaven Tops Previous Best Hole at the Middle Zone Deposit, La Mina Project, Colombia: LME-1072-134.39m at 0.65 g/t Au and 0.32%Cu, or 1.19 g/t Au Equivalent Amerix Options Concessions Adjacent to Limao Gold Property, Brazil
Bereitgestellt von Benutzer: MARKETWIRE
Datum: 14.05.2012 - 11:30 Uhr
Sprache: Deutsch
News-ID 145868
Anzahl Zeichen: 0

contact information:
Town:

VANCOUVER, BRITISH COLUMBIA



Kategorie:

Mining & Metals



Diese Pressemitteilung wurde bisher 296 mal aufgerufen.


Die Pressemitteilung mit dem Titel:
"Sunridge Gold Announces Positive Feasibility Study for the Debarwa Deposit, Asmara Project, Eritrea"
steht unter der journalistisch-redaktionellen Verantwortung von

Sunridge Gold Corp. (Nachricht senden)

Beachten Sie bitte die weiteren Informationen zum Haftungsauschluß (gemäß TMG - TeleMedianGesetz) und dem Datenschutz (gemäß der DSGVO).


Alle Meldungen von Sunridge Gold Corp.



 

Werbung



Facebook

Sponsoren

foodir.org The food directory für Deutschland
Informationen für Feinsnacker finden Sie hier.

Firmenverzeichniss

Firmen die firmenpresse für ihre Pressearbeit erfolgreich nutzen
1 2 3 4 5 6 7 8 9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z