East Africa Metals Intersects 21.19 metres grading 4.32 % copper, 1.04 grams per tonne gold, 35.9 gr

East Africa Metals Intersects 21.19 metres grading 4.32 % copper, 1.04 grams per tonne gold, 35.9 grams per tonne silver, and 6.98 % zinc at the Mayshehagne VMS prospect, continues both resource and exploration diamond drilling.

ID: 532479

(firmenpresse) -

East Africa Metals Intersects 21.19 metres grading 4.32 % copper, 1.04 grams per tonne gold, 35.9 grams per tonne silver, and 6.98 % zinc at the Mayshehagne VMS prospect, continues both resource and exploration diamond drilling.

Vancouver, British Columbia - March 27, 2017 - East Africa Metals Inc. (TSX-V: EAM or the Company) is pleased to announce results from a multi targeted drill program at the Harvest and Adyabo Projects in the Arabian Nubian Shield of Ethiopia. The Company has conducted additional drill testing of the Harvest Project Mayshehagne and VTEM09 VMS prospects to potentially upgrade targets, confirm interpretation of mineralization, and assess targets for inclusion as potential satellite resource zones. Both prospects are located near the EAMs Terakimti resource deposit. Drill intercepts continue to reflect very strong metal grades seen in previous drilling, and identifies the need for further delineation work on the VMS prospects.

Additionally, infill drilling has continued at the Adyabo Project Mato Bula and Da Tambuk resource deposits, with a 5,000 metre diamond infill drilling program in progress at Mato Bula. Results of Mato Bula Silica Hill infill drilling are also included in this release.

Highlight intersections include:
- At Silica Hill - 31.55 metres grading 9.40 grams per tonne gold, and 0.10 % copper, from 111.32 metres drill depth, and;

- At VTEM09 - 24.06 metres grading 1.88 % copper, 3.08 grams per tonne gold, 66.4 grams per tonne silver, and 2.54 % zinc, from 35.84 metres drill depth, and;

- At Mayshehagne - 21.19 metres grading 4.32 % copper, 1.04 grams per tonne gold, 35.9 grams per tonne silver, and 6.98 % zinc, from 36.58 metres drill depth.

Harvest VMS Prospect diamond drilling

A total of 9 diamond drillholes have been completed at the Mayshehagne and VTEM09 VMS prospects. Results confirm the high base and precious metal grades encountered in previous drilling, and provide encouragement in assessing the prospects for further exploration, in parallel with Terakimti advancement. As a VMS prospect, Mayshehagne intercepts exhibit notably high grade base metal values, whereas intercepts at VTEM09 exhibit notably high grade precious metal values.





Mayshehagne and VTEM09 diamond drill intercepts
Hole FromTo InterCoppeGoldSilvZincLocalDipProspec
ID (m) (m)val r er Azim t
(m) uth
1 % g/
t g/t %
2
HD011 36.557.721.194.32 1.0435.96.9890 -55Maysheh
8 7 agne

inclu36.546.610.027.74 1.8959.48.39
ding 8 0

inclu52.656.03.40 2.84 0.6240.014.2
ding 0 0 4

HD012 58.871.012.235.15 1.0735.93.0990 -53Maysheh
4 7 agne

HD013 80.593.212.760.40 0.131.300.2590 -54Maysheh
0 6 agne

HD014 26.136.910.805.86 1.2242.15.8280 -65Maysheh
5 5 agne

inclu26.132.15.95 8.18 1.7462.88.18
ding 5 0

TVD006 39.049.610.653.09 5.2368.64.25263 -49VTEM09
0 5

TVD007 65.572.26.72 0.84 1.3257.33.62263 -66VTEM09
3 5

TVD008No Significant Results 90 -65VTEM09
TVD009 35.859.924.061.88 3.066.4 2.5270 -50VTEM09
4 0 8 4

inclu46.257.911.672.93 5.1105.84.8
ding 3 0 5 9

TVD010No Significant Results 270 -50VTEM09
1 True thicknesses are interpreted as 50-90% of stated intervals.
2 No topcut has been used on analyses

Mato Bula Deposit diamond drilling

Work continues on upgrading the resource at the Mato Bula deposit, initially with a short infill drill program in the Silica Hill area, and a larger 5,000 metre infill program in the southern portion of the deposit. Large diameter core drilling was conducted on the central area of Silica Hill.

Results have been received for the initial Silica Hill drilling, and the larger 5,000 metre program is on-going with drilling completion estimated for the end of April 2017, and results expected prior to the end of Q2 2017.

Mato Bula diamond drill intercepts
Hole From To InterGold CopperLocal Dip Prospe
ID (m) val g/t % Azimu ct
(m) (m) 2,3 th
1
WMD061 105.8126.220.428.52 0.34 84 -55 Mato
4 6 Bula

inclu106.8123.416.6110.36 0.35
ding 4 5

inclu106.8116.810.0015.02 0.37
ding 4 4

WMD062 101.7119.117.431.46 0.11 84 -45 Mato
0 3 Bula

inclu108.2117.59.30 2.22 0.16
ding 0 0

125.2130.25.00 1.78 0.04
6 6

WMD063 92.85118.525.705.06 0.19 84 -47 Mato
5 Bula

inclu92.85105.412.629.21 0.32
ding 7

inclu99.47105.46.00 14.84 0.44
ding 7

WMD064 111.3142.831.559.40 0.10 84 -50 Mato
2 7 Bula

inclu119.1125.16.00 44.33 0.23
ding 0 0
1 True thicknesses are interpreted as 60-90% of stated intervals.
2 No topcut has been used on analyses
3 Intervals use a 0.3 gram per tonne gold cutoff value

Diagrams illustrating the recent drilling are located here: http://eastafricametals.mwnewsroom.com/press-releases/east-africa-metals-intersects-21-19-metres-grading-4-32-copper-1-04-grams-per-t-tsx-venture-eam-11g134114-001

Continuing Exploration

The first phase of an IP program targeted at the Mato Bula area has started mobilization. Results from this work are expected to help geophysically define the present deposit mineralized signature, identify additional drill targets, and provide guidance for EAM in the potential for rolling out a larger scale IP program over the entire multi-kilometre Mato Bula trend.

Additionally, as part of this phase of exploration, once exploration licence extensions are granted, EAM will conduct diamond drill on other existing priority targets.

Quality Control

The planning, execution, and monitoring of EAMs drilling and quality control programs at the Harvest and Adyabo Projects has been conducted under the supervision of Jeff Heidema, P.Geo., EAMs Vice President Exploration. Mr. Heidema is a Qualified Person as defined by NI 43-101, and has reviewed and approved the geological information contained in this news release. Diamond drilling was coordinated by EAMs contract geologists who also managed the preparation, logging, and sampling of core and rock samples, in addition to carrying out bulk density measurements. During sampling, quality control standards and blanks were introduced at pre-determined intervals to monitor laboratory performance. A system of field, reject, and pulp sample duplicates was also incorporated, as were specific programs of re-assaying and umpire lab assaying to both monitor laboratory performance and also characterize potential mineralization; all consistent with industry best practice.

Drill core samples have undergone preliminary preparation at the Bureau Veritas Mineral Laboratories facility in Ankara, Turkey, and are crushed to 80% passing 10 mesh, and pulverized to 85% passing 200 mesh (PRP70-1KG package). Analyses are conducted at Bureau Veritas Mineral Laboratories in Vancouver, Canada, with diamond drill core analyses utilizing Aqua Regia digestion and ICP-ES for base metal and silver analyses (AQ370 package), and Infill sample program utilizing Aqua Regia digestion and ICP-MS/ICP-ES (AQ270 package) for base metal and silver analyses. Gold analyses are conducted via Fire Assay Fusion with AA finish, and gravimetric analyses are completed for over-limit samples (FA430, FA530-Au packages).

Information recorded from diamond drill core assaying was integrated using industry standard data management software (Maxwell Datashed).

More information on the Company can be viewed at the Companys website: www.eastafricametals.com

On behalf of the Board of Directors:
Andrew Lee Smith, P.Geo., CEO

For further information contact:
Nick Watters, Business Development
Telephone: +1 (604) 488-0822
Email: investors(at)eastafricametals.com
Website: www.eastafricametals.com

Cautionary Statement Regarding Forward-Looking Information
This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "anticipate", "believe", "plan", "expect", "intend", "estimate", "forecast", "project", "budget", "schedule", "may", "will", "could", "might", "should" or variations of such words or similar words or expressions. Forward-looking information is based on reasonable assumptions that have been made by the Company as at the date of such information and is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information, including but not limited to: early exploration; the closing of the agreement with the exploration and development company to advance the Magambazi Project or identify any other corporate opportunities for the Company; mineral exploration and development; metal and mineral prices; availability of capital; accuracy of the Company's projections and estimates, including the initial mineral resource for the Adyabo, Harvest and Magambazi Projects; mining licence/permit applications, estimated exploration licence extensions, interest and exchange rates; competition; stock price fluctuations; availability of drilling equipment and access; actual results of current exploration activities; government regulation; political or economic developments; foreign taxation risks; environmental risks; insurance risks; capital expenditures; operating or technical difficulties in connection with development activities; personnel relations; the speculative nature of strategic metal exploration and development including the risks of diminishing quantities of grades of reserves; contests over title to properties and/or projects; and changes in project parameters as plans continue to be refined, as well as those risk factors set out in the Companys managements discussion and analysis for the year end December 31, 2015, managements discussion and analysis for the three and nine months ended September 30, 2016 and the Companys listing application dated July 8, 2013. Forward-looking statements are based on assumptions management believes to be reasonable, including but not limited to the successful integration of Tigray Resources Inc.s business with the Company; the price of gold, silver, copper and zinc; the demand for gold, silver, copper and zinc; the ability to carry on exploration and development activities; the timely receipt of any required approvals; the ability to obtain qualified personnel, equipment and services in a timely and cost-efficient manner; the ability to operate in a safe, efficient and effective manner; and the regulatory framework regarding environmental matters, the renewal or extension of exploration licences, and such other assumptions and factors as set out herein. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. The Company does not update or revise forward looking information even if new information becomes available unless legislation requires the Company do so. Accordingly, readers should not place undue reliance on forward-looking information contained herein, except in accordance with applicable securities laws.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.



Unternehmensinformation / Kurzprofil:
Leseranfragen:

Zu den wichtigsten Projekten und Beteiligungen des Unternehmens gehören das zu 70 % unternehmenseigene polymetallische VMS-Explorationsprojekt Harvest, das sich über eine Fläche von rund 116 Quadratkilometern in der äthiopischen Region Tigray rund 600 Kilometer nord-nordwestlich der Hauptstadt Adis Ababa erstreckt, und das Projekt Adyabo, das unmittelbar im Westen des Projekts Harvest eine Fläche von 312 Quadratkilometern einnimmt. Das Unternehmen hat eine Vereinbarung zum Erwerb einer Beteiligung von bis zu 80 % am Projekt Adyabo unterzeichnet.



drucken  als PDF  an Freund senden  eProseed migrates Al Rajhi Bank's DB systems to Oracle Exadata Best home security systems reviews will help you find the best offer on the market
Bereitgestellt von Benutzer: irw
Datum: 27.03.2017 - 11:00 Uhr
Sprache: Deutsch
News-ID 532479
Anzahl Zeichen: 13487

contact information:
Town:

Wien



Kategorie:

Business News



Diese Pressemitteilung wurde bisher 185 mal aufgerufen.


Die Pressemitteilung mit dem Titel:
"East Africa Metals Intersects 21.19 metres grading 4.32 % copper, 1.04 grams per tonne gold, 35.9 grams per tonne silver, and 6.98 % zinc at the Mayshehagne VMS prospect, continues both resource and exploration diamond drilling.
"
steht unter der journalistisch-redaktionellen Verantwortung von

EAST AFRICA METALS INC (Nachricht senden)

Beachten Sie bitte die weiteren Informationen zum Haftungsauschluß (gemäß TMG - TeleMedianGesetz) und dem Datenschutz (gemäß der DSGVO).


Alle Meldungen von EAST AFRICA METALS INC



 

Werbung



Facebook

Sponsoren

foodir.org The food directory für Deutschland
Informationen für Feinsnacker finden Sie hier.

Firmenverzeichniss

Firmen die firmenpresse für ihre Pressearbeit erfolgreich nutzen
1 2 3 4 5 6 7 8 9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z