Standard Lithium Completes Successful Gravity Geophysical Survey at Bristol Lake, Mojave Project, Ca

Standard Lithium Completes Successful Gravity Geophysical Survey at Bristol Lake, Mojave Project, California

ID: 545836

(Thomson Reuters ONE) -


VANCOUVER, British Columbia, June 01, 2017 (GLOBE NEWSWIRE) -- Standard Lithium
Ltd. ("Standard Lithium" or the "Company") (TSX-V:SLL) (FRA:S5L) is pleased to
announce that Hasbrouck Geophysics Inc. has completed a large-scale gravity
geophysical survey at the Company's Bristol Lake Project, in the Mojave area of
California.  The work has defined an infilled basin that is over twice as deep
as previously understood, with a maximum depth up to 1.2 km deep beneath the
Project area.

Dr. Andy Robinson, COO and President of Standard Lithium commented: "The results
from this geophysical survey are very encouraging.  This recent piece of high
quality work has resulted in more than doubling the thickness of the basin-
infill deposits that are known to host lithium brines.  In addition, we can see
that our claims, and those of our partner, are ideally located to further
explore these deep basin deposits.  This successful and rapid acquisition of
high quality gravity survey data from our Bristol Lake Project is an excellent
way to kick-off the lithium brine resource assessment work planned for the
remainder of 2017."

Hasbrouck Geophysics, Prescott, AZ collected gravity readings from 100 new
stations on the 20,000+ acres of claims and private land optioned to Standard.
Hasbrouck integrated an additional 58 public domain gravity stations that cover
adjacent BLM land.  The stations were spaced at 1600 m - 3200 m intervals along
13 north-south lines spaced 1600 m apart.  The depression covers an area of 15
km(2) at a depth of 1000 m, 46 km(2) at 750 m, and 140 km(2) at 500 m.  Several
faults were interpreted along two of the lines but it is not possible to tie
them to bedrock.  The overall quality of the data was very high.  Repeat
readings of new and base stations ranged between 0.02 and 0.04 Mgals and 0.011




and 0.02 Mgals, respectively.

The deep, well-defined gravity low and associated circumferential faults
indicate potential for structurally concentrated lithium brines at depth.  The
survey results will be used to plan further Phase 1 exploration, which will
include additional geophysical surveys to identify Li-brine bearing zones,
surface pit sampling and core drilling.  For further information on the Mojave
project please see Standard Lithium's Technical Report dated September
13, 2016, compiled in accordance with NI 43-101 guidelines on Sedar.com.

Quality Assurance

Raymond Spanjers, Certified Professional Geologist (SME No. 3041730), is a
qualified person as defined by NI 43-101, and has supervised the preparation of
the scientific and technical information that forms the basis for this news
release.  Mr. Spanjers is not independent of the Company as he is an officer in
his role as Vice President, Exploration and Development.

About Standard Lithium

Standard's value creation strategy encompasses acquiring a diverse and highly
prospective portfolio of large-scale domestic brine resources, led by an
innovation & results oriented management team with a strong focus on technical
skills.  The Company is currently focused on the immediate exploration and
development of its 16,000+ acre Bristol Lake, Brine Project located in the
Mojave region of San Bernardino County, California.  The location has
significant infrastructure in-place, with easy road and rail access, abundant
electricity and water sources, and is already permitted for extensive brine
extraction and processing activities.  Standard also recently announced the
acquisition of the 41,000+ acre Paradox Basin Project located in Grand County,
Utah.

On behalf of the Board,

Standard Lithium Ltd.

Robert Mintak, CEO & Director

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term
is defined in policies of the TSX Venture Exchange) accepts responsibility for
the adequacy or accuracy of this release.

For further information, contact Anthony Alvaro at 604.763.5388.




This announcement is distributed by Nasdaq Corporate Solutions on behalf of Nasdaq Corporate Solutions clients.
The issuer of this announcement warrants that they are solely responsible for the content, accuracy and originality of the information contained therein.

Source: Standard Lithium Ltd. via GlobeNewswire




Weitere Infos zu dieser Pressemeldung:
Unternehmensinformation / Kurzprofil:
drucken  als PDF  an Freund senden  AkzoNobel media conference call invitation Origin(TM) Announces First 50 Patients Randomized, and Full Site Activation in Phase IIb Dose-Ranging Study for Diabetic Foot Ulcers
Bereitgestellt von Benutzer: hugin
Datum: 01.06.2017 - 14:30 Uhr
Sprache: Deutsch
News-ID 545836
Anzahl Zeichen: 4929

contact information:
Town:

Vancouver



Kategorie:

Business News



Diese Pressemitteilung wurde bisher 232 mal aufgerufen.


Die Pressemitteilung mit dem Titel:
"Standard Lithium Completes Successful Gravity Geophysical Survey at Bristol Lake, Mojave Project, California"
steht unter der journalistisch-redaktionellen Verantwortung von

Standard Lithium Ltd. (Nachricht senden)

Beachten Sie bitte die weiteren Informationen zum Haftungsauschluß (gemäß TMG - TeleMedianGesetz) und dem Datenschutz (gemäß der DSGVO).


Alle Meldungen von Standard Lithium Ltd.



 

Werbung



Facebook

Sponsoren

foodir.org The food directory für Deutschland
Informationen für Feinsnacker finden Sie hier.

Firmenverzeichniss

Firmen die firmenpresse für ihre Pressearbeit erfolgreich nutzen
1 2 3 4 5 6 7 8 9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z