Skeena Intersects 14.82 g/t AuEq over 31.30 metres at Eskay Creek
(firmenpresse) - Vancouver, BC (February 11, 2020) Skeena Resources Limited (TSX.V: SKE, OTCQX: SKREF) (Skeena or the Company - https://www.commodity-tv.com/play/skeena-resources-infill-drilling-at-eskay-creek-to-increase-resource-possible-sale-of-project/ ) is pleased to announce additional gold-silver drill results from the 2019 Phase I surface drilling program at the Eskay Creek Project (Eskay Creek) located in the Golden Triangle of British Columbia. Four surface drill rigs were utilized for the 2019 Phase I program in the 21A, 21E and HW Zones to infill and upgrade areas of Inferred resources to the Indicated classification. Drill hole results reported in this release are from the 21A, 21E and HW Zones. Reference images are presented at the end of this release as well as on the Companys website.
Phase I Eskay Creek Drilling Highlights:
- 11.53 g/t Au, 247 g/t Ag (14.82 g/t AuEq) over 31.30 m (SK-19-172) - 21A Zone
- 15.02 g/t Au, 70 g/t Ag (15.96 g/t AuEq) over 18.26 m (SK-19-171A) - 21A Zone
- 1.51 g/t Au, 355 g/t Ag (6.24 g/t AuEq) over 21.00 m (SK-19-201) - 21E Zone
- 2.83 g/t Au, 44 g/t Ag (3.42 g/t AuEq) over 25.00 m (SK-19-208) - 21E Zone
Gold Equivalent (AuEq) calculated via the formula: Au (g/t) + [Ag (g/t) / 75]. Reported core lengths represent 80-100% of true widths and are supported by well-defined mineralization geometries derived from historical drilling. Grade capping of individual assays has not been applied to the Au and Ag assays informing the length weighted AuEq composites. Processing recoveries have not been applied to the AuEq calculation and are disclosed at 100%. Samples below detection limit are nulled to a value of zero.
2019 Drilling Continues to Intersect Increased Grades, While Confirming Widths
Infill drilling within the 21A Zone continues to improve upon historically defined grades as demonstrated by 2019 Phase I drill hole SK-19-172 which intersected 14.82 g/t AuEq over 31.30 metres. This drilling confirms the 21A Zone thickness as indicated by the nearest historical drill hole in the current mineral resource model which is located 20 metres down-dip and intersected slightly lower grade mineralization of 7.63 g/t AuEq over 26.90 metres (CA89-080).
Likewise, additional up-dip confirmation was provided by drill hole SK-19-061 which averaged 10.56 g/t AuEq over 27.50 metres and correlates very well with previously reported thickness from 2018 Phase I drill hole SK-18-023 that intersected 14.57 g/t AuEq over 31.50 metres.
Mineralization within this portion of the 21A Zone is dominantly hosted within the footwall rhyolite sequence with only a minor contribution from the mudstones (refer to attached section).
Current Status - Eskay Creek Drilling
Four surface-based drill rigs are currently on site at Eskay Creek. The Company anticipates commencement of the surface 2020 Phase I infill and exploration drilling program in mid-February 2020. The remaining analytical results from the 2019 Phase I drilling program will be disclosed once all information has been received and validated.
About Skeena
Skeena Resources Limited is a junior Canadian mining exploration company focused on developing prospective precious metal properties in the Golden Triangle of northwest British Columbia, Canada. The Companys primary activities are the exploration and development of the past-producing Eskay Creek mine, which contains a combined Indicated and Inferred 4Moz, 4.4 g/t gold-equivalent open-pit resource. The Company recently completed a Preliminary Economic Assessment (PEA) on Eskay Creek which highlights an after-tax NPV5% of C$638M, 51% IRR and a 1.2-year payback. Skeena is also exploring the past-producing Snip gold mine.
On behalf of the Board of Directors of Skeena Resources Limited,
https://www.irw-press.at/prcom/images/messages/2020/49990/Skeena Intersects 14 82 gt AuEq over 31 30 m at Eskay Creek_FINAL_1 ENPRcom.001.jpeg
Walter Coles Jr.
President & CEO
In Europe:
Swiss Resource Capital AG
Jochen Staiger
info(at)resource-capital.ch
www.resource-capital.ch
Qualified Persons
Exploration activities at the Eskay Creek Project are administered on site by the Companys Exploration Managers, Colin Russell, P.Geo. and Adrian Newton, P.Geo. In accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects, Paul Geddes, P.Geo. Vice President Exploration and Resource Development, is the Qualified Person for the Company and has prepared, validated and approved the technical and scientific content of this news release. The Company strictly adheres to CIM Best Practices Guidelines in conducting, documenting, and reporting its exploration activities on its exploration projects.
Quality Assurance - Quality Control
Once received from the drill and processed, all drill core samples are sawn in half, labelled and bagged. The remaining drill core is subsequently securely stored on site. Numbered security tags are applied to lab shipments for chain of custody requirements. The Company inserts quality control (QC) samples at regular intervals in the sample stream, including blanks and reference materials with all sample shipments to monitor laboratory performance. The QAQC program was designed and approved by Lynda Bloom, P.Geo. of Analytical Solutions Ltd., and is overseen by the Companys Qualified Person, Paul Geddes, P.Geo, Vice President Exploration and Resource Development.
Drill core samples are submitted to ALS Geochemistrys analytical facility in North Vancouver, British Columbia for preparation and analysis. The ALS facility is accredited to the ISO/IEC 17025 standard for gold assays and all analytical methods include quality control materials at set frequencies with established data acceptance criteria. The entire sample is crushed and 1kg is pulverized. Analysis for gold is by 50g fire assay fusion with atomic absorption (AAS) finish with a lower limit of 0.01 ppm and upper limit of 100 ppm. Samples with gold assays greater than 100ppm are re-analyzed using a 50g fire assay fusion with gravimetric finish. Analysis for silver is by 50g fire assay fusion with gravimetric finish with a lower limit of 5ppm and upper limit of 10,000ppm. Samples with silver assays greater than 10,000ppm are re-analyzed using a gravimetric silver concentrate method. A selected number of samples are also analyzed using a 48 multi-elemental geochemical package by a 4-acid digestion, followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) and Inductively Coupled Plasma Mass Spectroscopy (ICP-MS) and also for mercury using an aqua regia digest with Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) finish. Samples with sulfur reporting greater than 10% from the multi-element analysis are re-analyzed for total sulfur by Leco furnace and infrared spectroscopy.
Cautionary note regarding forward-looking statements
Certain statements made and information contained herein may constitute forward looking information and forward looking statements within the meaning of applicable Canadian and United States securities legislation. These statements and information are based on facts currently available to the Company and there is no assurance that actual results will meet managements expectations. Forward-looking statements and information may be identified by such terms as anticipates, believes, targets, estimates, plans, expects, may, will, could or would. Forward-looking statements and information contained herein are based on certain factors and assumptions regarding, among other things, the estimation of mineral resources and reserves, the realization of resource and reserve estimates, metal prices, taxation, the estimation, timing and amount of future exploration and development, capital and operating costs, the availability of financing, the receipt of regulatory approvals, environmental risks, title disputes and other matters. While the Company considers its assumptions to be reasonable as of the date hereof, forward-looking statements and information are not guarantees of future performance and readers should not place undue importance on such statements as actual events and results may differ materially from those described herein. The Company does not undertake to update any forward-looking statements or information except as may be required by applicable securities laws.
Neither TSX Venture Exchange nor the Investment Industry Regulatory Organization of Canada accepts responsibility for the adequacy or accuracy of this release.
Table 1: Eskay Creek Project 2019 Phase I length weighted drill hole gold and silver composites:
HOLE-IDFROM (TO (mCORE LENGTH AU (g AG (AUEQ (g/t) ZONE
m ) ( /t g/t
) m) ) )
SK-19-04.70 5.50 0.80 0.49 1.12 21A
96 47
SK-19-032.50 33.000.50 0.61 0.85 21A
96 18
SK-19-1 ASSAYS
00 PENDING
SK-19-122.16 22.700.54 1.28 1.35 21A
01
5
SK-19-1 ASSAYS
28 PENDING
SK-19-1 ASSAYS
30 PENDING
SK-19-11.40 3.35 0.03 <5 0.03 HW
33
SK-19-128.00 30.00 0.20 0.31 HW
44
8
SK-19-169.72 70.751.03 4.09 4.16 21A
50
5
SK-19-167.00 69.552.55 2.51 2.63 21A
55
9
SK-19-164.84 66.701.86 2.12 2.20 21A
58
6
SK-19-192.00 93.00 0.24 0.65 21A
62 31
SK-19-1 ABANDONED 21A
65
SK-19-1 ABANDONED 21A
65A
SK-19-180.40 82.402.00 2.25 3.08 21A
65B 63
SK-19-187.77 100.512.78 2.34 2.41 21A
65B 5
5
SK-19-1108.00110.02.00 1.98 3.01 21A
65B 0 78
SK-19-1 ABANDONED 21A
68
SK-19-190.50 102.011.50 4.96 6.38 21A
68A 0 107
SK-19-1108.50113.04.50 1.10 1.17 21A
68A 0
5
SK-19-1 ABANDONED 21A
71
SK-19-198.24 116.518.26 15.02 15.96 21A
71A 0 70
INCLUDI100.30101.51.20 13.25 <5 13.25 21A
NG 0
AND 101.50102.00.50 19.20 <5 19.20 21A
0
AND 104.50106.01.50 10.05 10.86 21A
0 61
AND 106.00107.51.50 41.50 44.17 21A
0 200
AND 107.50109.01.50 26.90 30.74 21A
0 288
AND 109.00110.51.50 14.30 17.29 21A
0 224
AND 110.50112.01.50 24.80 24.87 21A
0
5
AND 112.00113.01.00 15.45 15.56 21A
0
8
SK-19-1132.50137.04.50 1.01 1.20 21A
71A 0 14
SK-19-191.50 122.831.30 11.53 14.82 21A
72 0 247
INCLUDI92.15 92.650.50 10.10 11.55 21A
NG 109
AND 92.65 93.150.50 92.80 1,1107.53 21A
05
AND 93.15 94.000.85 140.0 153.08 21A
0 981
AND 94.00 94.510.51 141.5 146.57 21A
0 380
AND 94.51 95.150.64 22.60 2,252.33 21A
30
AND 95.15 95.900.75 21.30 1,136.10 21A
10
AND 95.90 96.400.50 18.85 30.93 21A
906
AND 96.40 96.900.50 19.30 2,654.10 21A
10
AND 113.65114.91.33 9.42 11.90 21A
8 186
SK-19-1132.50133.30.86 0.72 0.79 21A
72 6
5
SK-19-1140.00141.01.00 1.11 1.18 21A
72 0
5
SK-19-1 ABANDONED 21A
73
SK-19-194.80 95.861.06 0.61 0.72 21A
73A
8
SK-19-198.65 101.02.35 2.62 2.68 21A
73A 0
5
SK-19-191.48 102.010.57 3.36 3.48 21A
74 5
9
INCLUDI95.00 96.001.00 12.65 <5 12.65 21A
NG
SK-19-1117.00118.11.10 0.97 1.04 21A
74 0
5
SK-19-12.50 22.5020.00 0.90 0.98 21A
75
6
SK-19-128.00 53.8525.85 1.87 1.99 21A
75
9
SK-19-156.50 64.007.50 1.01 1.09 21A
75
6
SK-19-112.00 22.0010.00 1.01 1.21 21A
76 15
SK-19-129.50 37.167.66 1.09 1.17 21A
76
6
SK-19-143.47 45.201.73 0.74 0.87 21A
76 10
SK-19-17.50 25.0017.50 1.00 1.11 21A
77
8
SK-19-128.00 45.0017.00 1.03 1.21 21A
77 14
SK-19-15.00 30.7525.75 1.40 1.66 21A
78 20
SK-19-133.75 36.002.25 1.04 1.11 21A
78
5
SK-19-142.00 48.506.50 0.94 1.78 21A
78 63
SK-19-153.00 69.9016.90 0.78 1.25 21A
78 35
SK-19-183.00 104.521.50 2.04 2.13 21A
78 0
7
SK-19-1109.00110.51.50 1.31 1.38 21A
78 0
5
SK-19-1115.00116.51.50 0.79 0.86 21A
78 0
5
SK-19-1124.03128.34.32 1.64 2.49 21A
78 5 64
SK-19-14.75 35.0030.25 1.12 1.41 21A
79 22
SK-19-141.00 42.501.50 0.61 1.48 21A
79 65
SK-19-147.00 89.0042.00 1.10 1.26 21A
79 12
SK-19-192.00 118.026.00 1.26 1.64 21A
79 0 28
SK-19-1121.00124.03.00 1.10 1.17 21A
79 0
5
SK-19-11.50 4.50 3.00 0.31 1.25 21A
80 71
SK-19-114.50 23.509.00 1.81 1.90 21A
80
7
SK-19-126.00 29.503.50 1.41 1.48 21A
80
5
SK-19-132.50 40.007.50 1.04 1.90 21A
80 64
SK-19-143.00 58.5015.50 1.69 1.76 21A
80
5
SK-19-162.00 63.501.50 0.60 0.77 21A
80 13
SK-19-167.00 78.8311.83 1.45 1.57 21A
80
9
SK-19-181.50 99.0017.50 0.90 0.96 21A
80
5
SK-19-1104.00108.04.00 1.16 1.23 21A
80 0
5
SK-19-1118.50124.56.00 1.29 2.58 21A
80 0 97
SK-19-1152.00153.51.50 1.06 1.26 21A
80 0 15
SK-19-1169.00170.01.00 1.67 1.94 21A
80 0 20
SK-19-18.50 10.001.50 0.95 1.02 21A
81
5
SK-19-116.82 33.0016.18 0.88 0.94 21A
81
5
SK-19-136.00 39.503.50 0.68 0.75 21A
81
5
SK-19-142.65 66.0023.35 1.51 1.58 21A
81
6
SK-19-170.50 104.534.00 1.12 1.39 21A
81 0 20
SK-19-1110.00113.03.00 0.64 0.89 21A
81 0 19
SK-19-1125.00131.06.00 1.53 1.63 21A
81 0
7
SK-19-1134.00139.05.00 0.59 0.75 21A
81 0 12
SK-19-12.00 14.5012.50 0.90 1.64 21A
82 55
SK-19-137.70 47.169.46 0.77 1.10 21A
82 25
SK-19-151.12 63.0011.88 1.04 1.11 21A
82
6
SK-19-166.00 69.003.00 0.79 1.01 21A
82 17
SK-19-173.24 76.243.00 0.73 0.80 21A
82
5
SK-19-11.34 17.0015.66 1.26 1.98 21A
83 54
SK-19-122.50 24.001.50 0.20 0.84 21A
83 48
SK-19-141.50 50.008.50 2.74 2.92 21A
83 14
INCLUDI48.95 50.001.05 10.50 10.87 21A
NG 28
SK-19-153.15 54.501.35 0.83 1.00 21A
83 13
SK-19-159.95 62.402.45 0.77 0.84 21A
83
5
SK-19-165.00 71.156.15 1.28 1.51 21A
83 17
SK-19-178.50 79.751.25 0.88 0.95 21A
83
5
SK-19-190.00 91.501.50 1.70 1,117.63 21A
83 95
SK-19-1100.00106.06.00 0.72 0.88 21A
83 0 13
SK-19-1118.18118.60.50 0.70 0.82 21A
83 8
9
SK-19-11.96 13.0011.04 1.26 3.18 21A
84 144
INCLUDI10.00 11.501.50 1.68 11.15 21A
NG 710
SK-19-12.05 15.5013.45 1.06 1.51 21A
84A 34
SK-19-121.53 23.501.97 1.02 1.09 21A
84A
5
SK-19-141.00 61.5020.50 1.05 1.21 21A
84A 12
SK-19-164.50 71.657.15 1.05 1.63 21A
84A 44
SK-19-196.30 99.152.85 1.42 1.48 21A
84A
5
SK-19-1103.50106.53.00 1.56 1.63 21A
84A 0
5
SK-19-1115.38116.00.62 0.77 0.84 21A
84A 0
5
SK-19-11.50 5.00 3.50 2.80 3.55 21E
85 56
SK-19-11.41 8.00 6.59 8.73 9.09 21E
86 27
INCLUDI3.81 5.00 1.19 20.70 22.01 21E
NG 98
AND 5.00 6.50 1.50 17.45 17.62 21E
13
SK-19-18.50 10.001.50 1.15 3.48 21E
87 175
SK-19-131.00 32.001.00 1.07 1.14 21E
87
5
SK-19-113.00 14.501.50 0.71 0.78 21E
88
5
SK-19-117.17 18.271.10 1.48 1.55 21E
88
5
SK-19-119.00 20.001.00 0.75 0.82 21E
89
5
SK-19-129.10 37.007.90 1.06 1.16 21E
89
7
SK-19-143.00 53.1010.10 1.13 1.19 21E
89
5
SK-19-131.30 32.501.20 0.65 0.76 21E
90
8
SK-19-137.00 45.508.50 1.13 1.24 21E
90
8
SK-19-115.48 15.980.50 0.89 0.96 21E
91
5
SK-19-120.00 29.509.50 1.71 2.06 21E
91 27
SK-19-141.50 43.001.50 0.80 0.87 21E
91
5
SK-19-16.00 7.50 1.50 0.81 0.92 21E
92
8
SK-19-114.40 15.601.20 0.73 0.79 21E
92
5
SK-19-124.00 31.747.74 1.48 2.02 21E
92 40
SK-19-141.50 42.641.14 0.72 0.79 21E
92
5
SK-19-15.50 8.00 2.50 0.76 0.84 21E
93
6
SK-19-113.00 14.251.25 1.60 1.66 21E
93
5
SK-19-118.00 43.5025.50 1.76 2.04 21E
93 21
SK-19-10.87 2.50 1.63 2.77 3.01 21E
94 18
SK-19-110.00 14.504.50 1.23 1.44 21E
94 16
SK-19-111.50 19.508.00 1.07 1.28 21E
94A 16
SK-19-129.00 31.502.50 3.95 4.02 21E
94A
5
SK-19-18.00 14.376.37 1.51 2.18 21E
95 50
SK-19-117.00 18.381.38 0.53 0.70 21E
95 13
SK-19-152.00 56.004.00 2.32 2.38 21E
95
5
SK-19-12.93 5.90 2.97 0.90 0.97 21E
96
5
SK-19-111.72 14.002.28 1.59 1.86 21E
96 20
SK-19-117.67 22.004.33 2.66 4.20 21E
96 116
SK-19-18.00 10.792.79 0.73 0.86 21E
97 10
SK-19-111.00 12.501.50 25.80 27.05 21E
98 94
SK-19-18.00 9.80 1.80 1.12 1.21 21E
98A
7
SK-19-16.02 7.67 1.65 1.24 1.31 21E
99
5
SK-19-25.75 7.25 1.50 0.74 0.81 21E
00
5
SK-19-259.50 67.007.50 0.66 0.79 21E
00 10
SK-19-228.00 30.582.58 1.61 1.70 21E
01
7
SK-19-242.50 63.5021.00 1.51 6.24 21E
01 355
INCLUDI43.60 45.001.40 2.17 1,522.84 21E
NG 50
AND 54.90 55.400.50 4.24 4,463.84 21E
70
SK-19-266.50 71.004.50 1.37 1.44 21E
01
5
SK-19-232.00 33.501.50 0.55 1.47 21E
02 69
SK-19-236.00 37.751.75 1.18 1.25 21E
02
5
SK-19-242.22 63.0020.78 1.21 1.44 21E
02 18
SK-19-269.00 70.461.46 0.84 1.37 21E
02 40
SK-19-2 ABANDONED 21E
03
SK-19-27.00 8.00 1.00 0.92 0.99 21E
03A
5
SK-19-234.00 34.500.50 1.11 1.23 21E
03A
9
SK-19-237.00 38.161.16 1.02 1.10 21E
03A
6
SK-19-246.50 54.508.00 0.82 0.91 21E
03A
7
SK-19-261.00 61.840.84 0.70 0.77 21E
03A
5
SK-19-228.00 31.003.00 2.74 2.81 21E
04
5
SK-19-233.73 34.430.70 1.31 1.38 21E
04
5
SK-19-237.25 43.005.75 1.31 1.51 21E
04 15
SK-19-246.00 49.003.00 0.88 0.95 21E
04
5
SK-19-254.50 57.693.19 1.46 1.53 21E
04
5
SK-19-260.50 62.001.50 1.10 1.17 21E
04
5
SK-19-223.50 28.004.50 1.17 1.24 21E
05
5
SK-19-233.72 36.002.28 0.75 0.94 21E
05 14
SK-19-241.10 51.3510.25 2.78 2.98 21E
05 15
SK-19-28.00 9.50 1.50 0.35 0.43 21E
06
6
SK-19-25.00 6.00 1.00 0.30 0.61 21E
07 23
SK-19-21.90 9.50 7.60 0.64 2.03 21E
08 104
SK-19-212.50 25.0012.50 0.64 1.05 21E
08 31
SK-19-237.00 62.0025.00 2.83 3.42 21E
08 44
SK-19-22.00 10.508.50 0.64 3.50 21E
09 215
INCLUDI4.00 4.50 0.50 1.59 1,623.19 21E
NG 20
SK-19-214.00 19.505.50 2.35 4.47 21E
09 159
INCLUDI14.85 15.350.50 13.65 21.93 21E
NG 621
SK-19-222.50 24.982.48 0.75 0.91 21E
09 13
SK-19-240.00 45.005.00 2.01 4.11 21E
09 158
INCLUDI44.00 45.001.00 2.81 10.20 21E
NG 554
SK-19-252.05 53.501.45 2.59 2.66 21E
09
5
SK-19-214.30 17.002.70 4.51 6.02 21E
10 114
SK-19-230.00 39.509.50 0.88 1.53 21E
10 48
SK-19-242.90 44.001.10 0.85 3.58 21E
10 205
SK-19-214.00 17.303.30 4.39 5.79 21E
11 105
SK-19-226.50 41.5015.00 1.06 1.86 21E
11 60
SK-19-265.50 91.0025.50 1.31 1.46 21E
11 12
SK-19-27.38 14.006.62 3.68 4.15 21E
12 35
SK-19-24.25 20.0015.75 2.06 2.40 21E
12A 26
SK-19-27.14 20.3213.18 1.36 1.75 21E
13 29
SK-19-222.43 23.451.02 1.00 1.23 21E
13 17
SK-19-231.94 35.003.06 1.34 1.81 21E
13 35
SK-19-26.24 20.4014.16 3.67 4.00 21E
14 25
SK-19-224.08 34.5010.42 0.88 1.11 21E
14 17
Gold Equivalent (AuEq) calculated via the formula: Au (g/t) + [Ag (g/t) / 75]. Reported core lengths represent 80-100% of true widths and are supported by well-defined mineralization geometries derived from historical drilling. Length weighted AuEq composites were constrained by geological considerations. Grade capping of individual assays has not been applied to the Au and Ag assays informing the length weighted AuEq composites. Processing recoveries have not been applied to the AuEq calculation and are disclosed at 100%. Samples below detection limit were nulled to a value of zero.
Table 2: Mine grid Phase I drill hole locations and orientations:
HOLE-ID EASTINGNORTHING ELEVATION LENGTH ( AZIMUT DIP
m) H
SK-19-09 9 45 286-45.0
6 9904.0 951.0 992.8 .0 .0
SK-19-10 1013 41 7-59.8
0 9973.0 9.0 972.6 .4 3.2
SK-19-10 1013 42 130-65.5
1 9973.0 9.0 972.6 .0 .4
SK-19-12 100 1052 36 161-60.3
8 86.0 7.0 941.0 .0 .6
SK-19-13 100 1052 40 210-55.1
0 86.0 7.0 941.0 .0 .7
SK-19-13 1084 25 181-50.4
3 9925.1 7.4 874.1 .0 .3
SK-19-14 1074 44 188-65.7
4 9933.1 4.1 909.8 .0 .7
SK-19-15 1009 10 86 187-53.0
0 9709.7 3.7 19.8 .0 .6
SK-19-15 9 10 95 7-85.4
5 9765.3 994.8 39.8 .0 3.2
SK-19-15 9 10 86 273-75.5
8 9763.8 996.1 40.8 .0 .6
SK-19-16 1002 10 107.0 278-72.0
2 9796.4 7.9 43.1 .2
SK-19-16 1011 10 11 126-57.7
5 9871.3 6.9 31.0 .0 .7
SK-19-16 1011 10 25 133-57.4
5 9871.3 6.9 31.0 .4 .0
A
SK-19-16 1011 10 110.0 131-57.3
5B 9871.3 6.9 31.0 .6
SK-19-16 1016 10 29 106-49.5
8 9905.7 0.8 30.1 .0 .2
SK-19-16 1016 10 122.0 105-52.0
8A 9905.7 0.8 30.1 .5
SK-19-17 1016 10 66 106-62.4
1 9883.2 5.3 34.8 .0 .4
SK-19-17 1016 10 137.0 102-63.3
1A 9883.2 5.3 34.8 .7
SK-19-17 1016 10 146.0 119-52.7
2 9883.0 4.5 35.3 .2
SK-19-17 1019 10 23 107-65.4
3 9893.6 8.7 34.8 .0 .8
SK-19-17 1019 10 125.0 115-65.7
3A 9893.6 8.7 34.8 .7
SK-19-17 1019 10 125.0 112-56.2
4 9894.1 8.4 34.5 .3
SK-19-17 9 10 65 281-88.1
5 9876.9 909.0 23.2 .0 .4
SK-19-17 9 10 45 178-66.0
6 9871.2 896.3 22.4 .2 .9
SK-19-17 9 10 450.0 -90.0
7 9870.7 895.9 21.8 .0
SK-19-17 9 10 146.0 289-85.2
8 9860.3 891.2 18.5 .0
SK-19-17 9 10 155.0 316-78.0
9 9859.9 891.4 22.1 .9
SK-19-18 9 10 171.7 246-89.8
0 9859.7 938.1 24.7 .5
SK-19-18 9 10 155.0 146-82.0
1 9860.4 937.7 26.3 .8
SK-19-18 9 10 137.0 5-85.8
2 9861.5 874.6 21.2 9.0
SK-19-18 9 10 122.0 288-85.7
3 9858.5 874.6 26.6 .8
SK-19-18 9 10 20 205-82.0
4 9860.0 874.6 20.5 .0 .1
SK-19-18 9 10 116.0 190-82.8
4A 9860.0 874.6 20.5 .8
SK-19-18 101 1024 35 7-53.0
5 36.0 6.7 974.7 .0 2.1
SK-19-18 101 1024 35 174-86.2
6 35.1 6.0 975.0 .0 .1
SK-19-18 101 1027 32 239-89.4
7 35.4 6.0 983.3 .0 .0
SK-19-18 101 1026 50 185-64.7
8 45.5 7.4 982.8 .0 .3
SK-19-18 101 1025 56 229-59.8
9 02.8 2.5 968.2 .0 .5
SK-19-19 101 1025 65 261-72.1
0 03.9 1.5 966.3 .0 .0
SK-19-19 101 1025 56 185-72.4
1 03.9 1.5 966.3 .0 .3
SK-19-19 101 1025 62 186-54.0
2 06.1 0.3 965.7 .0 .0
SK-19-19 101 1025 50 144-53.2
3 04.7 1.6 965.7 .0 .9
SK-19-19 101 1031 16 215-79.8
4 51.4 8.9 983.1 .0 .7
SK-19-19 101 1031 47 226-78.9
4A 51.4 8.7 983.4 .0 .4
SK-19-19 101 1031 56 226-62.2
5 50.7 8.7 983.3 .0 .5
SK-19-19 101 1031 50 174-64.0
6 51.3 8.7 982.7 .0 .3
SK-19-19 101 1031 53 121-71.6
7 52.6 8.6 982.8 .0 .2
SK-19-19 101 1031 14 4-80.0
8 52.7 8.2 982.6 .0 5.0
SK-19-19 101 1031 56 6-80.0
8A 52.7 8.2 982.6 .0 1.9
SK-19-19 101 1031 56 4-61.1
9 52.4 9.4 981.9 .0 5.5
SK-19-20 100 1026 77 3-81.4
0 79.8 3.8 966.1 .0 9.7
SK-19-20 100 1026 77 5-61.1
1 82.8 1.9 969.3 .0 8.5
SK-19-20 100 1026 77 6-72.6
2 82.8 1.6 969.6 .0 1.1
SK-19-20 100 1026 14 8-80.1
3 82.3 2.4 968.4 .0 3.2
SK-19-20 100 1026 71 8-79.2
3A 82.3 2.4 968.4 .0 5.7
SK-19-20 100 1026 68 8-64.8
4 82.7 0.3 969.8 .0 6.0
SK-19-20 100 1026 65 8-50.5
5 83.4 0.1 969.1 .0 2.4
SK-19-20 101 1026 50 277-88.5
6 45.5 7.4 982.8 .0 .9
SK-19-20 101 1026 47 129-66.3
7 47.3 7.0 981.8 .0 .6
SK-19-20 101 1030 62 150-67.0
8 19.8 3.5 979.5 .0 .9
SK-19-20 101 1030 65 149-51.4
9 19.9 3.5 980.9 .0 .0
SK-19-21 100 1028 86 5-81.5
0 77.8 6.2 977.7 .0 4.0
SK-19-21 100 1028 92 5-74.4
1 78.5 5.6 977.7 .0 7.5
SK-19-21 101 1033 14 3-67.6
2 34.8 6.7 983.7 .0 8.8
SK-19-21 101 1033 41 2-71.0
2A 34.8 6.7 983.7 .0 5.4
SK-19-21 101 1033 35 255-51.8
3 34.2 6.8 984.2 .0 .7
SK-19-21 101 1033 41 320-79.8
4 34.4 7.1 985.2 .0 .3
https://www.irw-press.at/prcom/images/messages/2020/49990/Skeena Intersects 14 82 gt AuEq over 31 30 m at Eskay Creek_FINAL_1 ENPRcom.002.png
https://www.irw-press.at/prcom/images/messages/2020/49990/Skeena Intersects 14 82 gt AuEq over 31 30 m at Eskay Creek_FINAL_1 ENPRcom.003.png
Leseranfragen:





">
Datum: 11.02.2020 - 14:05 Uhr
Sprache: Deutsch
News-ID 606877
Anzahl Zeichen: 57918
contact information:
Town:
Wien
Kategorie:
Business News
Diese Pressemitteilung wurde bisher 170 mal aufgerufen.
Die Pressemitteilung mit dem Titel:
"Skeena Intersects 14.82 g/t AuEq over 31.30 metres at Eskay Creek
"
steht unter der journalistisch-redaktionellen Verantwortung von
Skeena Resources Ltd. (Nachricht senden)
Beachten Sie bitte die weiteren Informationen zum Haftungsauschluß (gemäß TMG - TeleMedianGesetz) und dem Datenschutz (gemäß der DSGVO).